County: Rio Arriba<br />
Agua Sana WUA<br />
CPB No: WTB-179<br />
Funding:<br />
Project Amount<br />
WTB<br />
$300,000.00<br />
CPB Manager: Telmo, Andrea Grant Amount: $300,000.00<br />
Population Served by This Project 815 Loan Amount: $0.00<br />
Project Phase: Construction Fund Balance: $266,444.02<br />
Problem: Private wells in the proposed project area have shown elevated nitrate levels in the groundwater.<br />
Well #1 and #2 produce water that exceeds the MCL for arsenic. This presents long term health<br />
issues to the association members.<br />
Solution: Connect Well#2 to the water system and construct an arsenic treatment building and treatment<br />
facilities for Well #1 and #2.<br />
Project: Agua Sana Water System Improvements<br />
Design and Construct Water System Improvements including Connecting Well # 2 to the system and Arsenic<br />
Removal. The Preliminary Engineering <strong>Report</strong> was reviewed and approved by Pat Klock on 12/13/2010. The<br />
Plans and Specifications for the Well #2 Connection Project were reviewed and approved by Andrea Pollock on<br />
8/15/11. The loan/grant agreement closing date has been moved from September 2011 to March 16th, 2012.<br />
NMFA MOU expired June 30, 2012. No activity by CPB pending new MOU.<br />
County: Rio Arriba<br />
Alcalde MDWA<br />
CPB No: SAP 12-1622-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Telmo, Andrea Grant Amount: $180,647.95<br />
Population Served by This Project 105 Loan Amount: $0.00<br />
Project Phase:<br />
Grant Agreement Phase<br />
Problem: lack of distribution lines<br />
Solution: install new distribution lines<br />
Project: to plan, design and construct a community water system, including water transmission<br />
and distribution lines, in Alcalde in Rio Arriba county.<br />
To plan, design, and construct a community water system, including water transmission and distribution lines.<br />
Awaiting receipt of signed grant agreements for execution. Duplicate grant agreement package provided<br />
12/18/2012.<br />
County: Rio Arriba<br />
Canjilon MDWC<br />
CPB No: SAP 12-1363-STB<br />
$0.00<br />
Fund Balance: $180,647.95<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Telmo, Andrea Grant Amount: $25,000.00<br />
Population Served by This Project 330 Loan Amount: $0.00<br />
Project Phase:<br />
Design Phase<br />
Problem: Distribution system has non-functioning flush hydrants.<br />
Solution: Install new flush hydrants.<br />
Project: to plan, design and construct water system improvements, including purchase and<br />
installation of flush hydrants, for the Canjilon mutual domestic water consumers and<br />
mutual sewage works association in Canjilon in Rio Arriba county.<br />
To plan, design and construct water system improvements, including purchase and installation of flush hydrants, for<br />
the Canjilon mutual domestic water consumers and mutual sewage works association in Canjilon in Rio Arriba<br />
county. CPB reviewed and approved engineering contract October 2012 and awaiting receipt of executed contract.<br />
Project to be bid for construction in spring. 12/19/2012<br />
$0.00<br />
Fund Balance: $25,000.00<br />