County: Dona Ana<br />

Dona Ana MDWCA<br />

CPB No: FY02<br />

Funding:<br />

Project Amount<br />

STAG<br />

$1,164,000.00<br />

CPB Manager: Deal, Steven Grant Amount: $1,164,000.00<br />

Population Served by This Project 22,186 Loan Amount: $0.00<br />

Project Phase: Construction Fund Balance: $929,974.79<br />

Problem:<br />

Solution:<br />

Project:<br />

The Association needs water system upgrades to maintain and enhance service to their members.<br />

These funds have been used to rehabilitate water tanks in conjunction with ARRA funds, and the<br />

will be used to upsize transmission lines in preparation of the Surface Water Treatment Plant in<br />

Fort Selden.<br />

Water System Upgrades<br />

$1,164,000 to upgrade water system. Souder Miller has been contracted for planning and design under other state<br />

and federal funding. Awaiting completed grant agreement from EPA. Project on the East Mesa is stalled due to<br />

ruling by the PRC. Waiting for further legal action. Facilities Plan for wastewater was reviewed and comments sent<br />

on August 19, 2004. Facilities plan/PER was resubmitted on June 2, 2005. It was rejected by BECC and NMED as<br />

unresponsive to previous comments and was not a 90% submittal. Meetings between NMED and BECC with<br />

DAMDWCA have been unsuccessful in getting the project on track. BECC sent a letter on October 7, 2005 outlining<br />

the problems this far in the planning process. The revised Wastewater Facilities is due on October 30, and the First<br />

draft of the water facilities plan is due in early December 2005. The revised facility plans were received in early<br />

January of 2007 and are currently under review. 5/14/2007 JAC reviews and conditionally approves of plans and<br />

specs for I-25 Crossing, Del Rey & Thorpe Road, North Tanks modifications. North Tanks Rehab Project was<br />

constructed in conjunction with NMFA ARRA funding.<br />

Next phase of improvements is expected to be along Armstrong and Angler Roads, pending EA approval by<br />

USEPA. NEPA for Armstrong Engler and the Surface Water Treatment Plant and Transmission lines have been<br />

approved. SD 7/9/12 The Armstrong Engler project has bid and is nearing the start of construction, and the<br />

Surface Water Transmission line project is being bid now. It is expected that the rest of these funds will be<br />

expended in the next year. SD 12/11/12<br />

County: Dona Ana<br />

Dona Ana MDWCA<br />

CPB No: FY04<br />

Funding:<br />

Project Amount<br />

STAG<br />

$120,500.00<br />

CPB Manager: Deal, Steven Grant Amount: $120,500.00<br />

Population Served by This Project 22,816 Loan Amount: $0.00<br />

Project Phase: Planning Phase Fund Balance: $120,500.00<br />

Problem: The North Valley has a mix of septic systems and wastewater collections that go to the City<br />

WWTP through County pipes.<br />

Solution: The Doña Ana MDWCA would like to maximize groundwater protection and reduce aquifer mining<br />

with a Wastewater treatment Plant (WWTP) that can provide reclaimed wastewater for local<br />

irrigation.<br />

Project: Wastewater <strong>Infrastructure</strong> Improvements in Northern Dona Ana County<br />

The revised facility plans were received by NMED and reviewed and comments sent to DAMDWCA. NMED<br />

awaiting the re-submittal of the documents for final review. Funds on hold per JAC for WWTP land acquisition;<br />

expected final public meeting on EID scheduled for 6/9/11. Use of these funds to purchase the land cannot be<br />

permitted due to violations of the grant conditions. <strong>Environment</strong>al Assessment submittal to USEPA is pending.<br />

1/5/12 SD Project is on hold until a viable project is found that falls into the grantee's master plan. SD 12/11/12<br />