County: Lincoln<br />
Nogal MDWCA<br />
CPB No: WTB-160<br />
Funding:<br />
Project Amount<br />
WTB<br />
$369,500.00<br />
CPB Manager: Telmo, Andrea Grant Amount: $369,500.00<br />
Population Served by This Project 96 Loan Amount: $0.00<br />
Project Phase: Construction Fund Balance: $369,133.85<br />
Problem: Existing infrastructure is deteriorating, aging, and undersized, and existing surface water<br />
treatment system does not meet current regulations.<br />
Solution: Construct new surface water treatment system which complies with current regulations, construct<br />
larger water storage tank, and replace undersized waterlines with larger diameter pipe.<br />
Project: Water Conservation, Treatment, Recycling or Reuse<br />
Original scope of project consists of planning, design and engineering for Phase I improvements to water treatment,<br />
storage and distribution system, including a membrane treatment system to remove turbidity from the surface water<br />
from Bonito Lake, a disinfection system, a booster pumping station to fill the water storage tank, and a 35,000-<br />
gallon tank. Little Bear Fire in June 2012 adversely impacted Bonito Lake. Change of scope requested and granted<br />
by WTB September 2012. Funding to be used for construction completion of pump house and installation and<br />
Phase 1 waterline. NMFA MOU expired June 30, 2012. No activity by CPB pending new MOU.<br />
County: Lincoln<br />
Ruidoso, Village of<br />
CPB No: SAP 12-1354-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Pollock, Andrea Grant Amount: $122,000.00<br />
Population Served by This Project 10,844 Loan Amount: $0.00<br />
Project Phase: Planning Phase Fund Balance: $26,156.04<br />
Problem:<br />
Solution:<br />
Project:<br />
The Village of Ruidoso and City of Ruidoso Downs are in the process of relocating sewer lines<br />
which were damaged in the 2008 flood due to the location in/near the Rio Ruidoso.<br />
The project will fund the first phase of engineering the sewer line relocation project.<br />
To design and construct sewer system facilities in Ruidoso in Lincoln county.<br />
Awaiting executed grant agreement. Ruidoso has procured engineer CH2M Hill. Grant Agreement Executed<br />
10/01/12. Engineering Services in progress 12/10/12.<br />
$0.00<br />
23