County: Lincoln<br />

Nogal MDWCA<br />

CPB No: WTB-160<br />

Funding:<br />

Project Amount<br />

WTB<br />

$369,500.00<br />

CPB Manager: Telmo, Andrea Grant Amount: $369,500.00<br />

Population Served by This Project 96 Loan Amount: $0.00<br />

Project Phase: Construction Fund Balance: $369,133.85<br />

Problem: Existing infrastructure is deteriorating, aging, and undersized, and existing surface water<br />

treatment system does not meet current regulations.<br />

Solution: Construct new surface water treatment system which complies with current regulations, construct<br />

larger water storage tank, and replace undersized waterlines with larger diameter pipe.<br />

Project: Water Conservation, Treatment, Recycling or Reuse<br />

Original scope of project consists of planning, design and engineering for Phase I improvements to water treatment,<br />

storage and distribution system, including a membrane treatment system to remove turbidity from the surface water<br />

from Bonito Lake, a disinfection system, a booster pumping station to fill the water storage tank, and a 35,000-<br />

gallon tank. Little Bear Fire in June 2012 adversely impacted Bonito Lake. Change of scope requested and granted<br />

by WTB September 2012. Funding to be used for construction completion of pump house and installation and<br />

Phase 1 waterline. NMFA MOU expired June 30, 2012. No activity by CPB pending new MOU.<br />

County: Lincoln<br />

Ruidoso, Village of<br />

CPB No: SAP 12-1354-STB<br />

Funding:<br />

Project Amount<br />

SAP Grants<br />

CPB Manager: Pollock, Andrea Grant Amount: $122,000.00<br />

Population Served by This Project 10,844 Loan Amount: $0.00<br />

Project Phase: Planning Phase Fund Balance: $26,156.04<br />

Problem:<br />

Solution:<br />

Project:<br />

The Village of Ruidoso and City of Ruidoso Downs are in the process of relocating sewer lines<br />

which were damaged in the 2008 flood due to the location in/near the Rio Ruidoso.<br />

The project will fund the first phase of engineering the sewer line relocation project.<br />

To design and construct sewer system facilities in Ruidoso in Lincoln county.<br />

Awaiting executed grant agreement. Ruidoso has procured engineer CH2M Hill. Grant Agreement Executed<br />

10/01/12. Engineering Services in progress 12/10/12.<br />

$0.00<br />