County: Sandoval<br />

Santo Domingo, Pueblo of<br />

CPB No: TIF 12-11-DC PIF 1<br />

Funding:<br />

Project Amount<br />

TIF<br />

$1,000,000.00<br />

CPB Manager: DuBois, Stephanie Grant Amount: $1,000,000.00<br />

Population Served by This Project 40 Loan Amount: $0.00<br />

Project Phase:<br />

Problem:<br />

Solution:<br />

Project:<br />

Design Phase<br />

existing water storage tank old and leaks<br />

construct new water storage tank<br />

Pueblo of Santo Domingo Community Water Tank<br />

Fund Balance: $1,000,000.00<br />

$1,000,000 design and construct a new 400,000-gallon water storage tank. 11-5-12 CPB discussed the project with<br />

Blane Sanchez, Tribal Utility Authority Director. Indian Health Services (I.H.S.) is providing the design and will<br />

subcontract the geotechnical work. I.H.S is 75% complete with the design but requested Pueblo funds to be paid<br />

upfront to I.H.S. 11-14-12 CPB informed Pueblo and I.H.S that the TIF funding is based upon a reimbursement<br />

process. 11-29-12 coordination meeting cancelled with Pueblo, IAD and I.H.S. 12-14-12 IAD stated that TIF<br />

funding can be utilized toward I.H.S. fees for design but the funding is paid out on a reimbursement process.<br />

Pueblo will have to find a way to pay I.H.S upfront and then be reimbursed under the TIF funding.<br />

County: Sandoval<br />

Zia, Pueblo of<br />

CPB No: TIF 12-12-DC PIF 3<br />

Funding:<br />

Project Amount<br />

TIF<br />

$1,303,669.00<br />

CPB Manager: DuBois, Stephanie Grant Amount: $1,303,669.00<br />

Population Served by This Project 500 Loan Amount: $0.00<br />

Project Phase:<br />

Problem:<br />

Solution:<br />

Project:<br />

Construction<br />

lack of quality water<br />

drill wells and run transmission line<br />

Zia, Pueblo of Potable Water Project<br />

Fund Balance: $1,303,669.00<br />

$1,303,669 for design and drilling of two or more wells and the installation of 14,100 feet of water transmission line.<br />

11-28-12 CPB met with the Governor of Zia Pueblo & Pueblo's project manager and conducted site inspection.<br />

Project is currently under construction. Well driller mobilized and started drilling. As of 12-11-12 CPB is waiting for<br />

project manager to submit engineering plans for well drilling, construction contract, and project management<br />

contract for oversight.<br />