County: Taos<br />
El Prado WSD<br />
CPB Manager: Telmo, Andrea<br />
CPB No: WTB-107<br />
Funding:<br />
Project Amount<br />
Grant Amount:<br />
WTB<br />
$1,750,000.00<br />
$1,750,000.00<br />
Population Served by This Project 1,000 Loan Amount: $0.00<br />
Project Phase: Construction Fund Balance: $736,072.28<br />
Problem:<br />
Solution:<br />
Project:<br />
El Prado WSD has only one well in operation so there is no emergency backup/supplemental<br />
water supply and does not have adequate water storage for fire protection.<br />
Drill a supplemental water supply well and construction a new water storage tank.<br />
Water Storage, Conveyance and Delivery<br />
Project consists of completing the infrastructure for Well #3 and the transmission line between Well #3 and storage<br />
tanks, purchasing property adjacent to the existing storage tanks, constructing new 500,000-gallon water storage<br />
tank, and completing additional looping lines. The majority of the waterline looping project has been completed and<br />
approx. 30% of the Well #3 infrastructure and booster station are complete. Additional funding is needed to<br />
complete construction. NMFA MOU expired June 30, 2012. No activity by CPB pending new MOU.<br />
County: Taos<br />
El Prado WSD<br />
CPB Manager: Telmo, Andrea<br />
CPB No: WTB-85<br />
Funding:<br />
Project Amount<br />
Grant Amount:<br />
WTB<br />
$2,000,000.00<br />
$2,000,000.00<br />
Population Served by This Project 1,000 Loan Amount: $0.00<br />
Project Phase: Construction Fund Balance: $62,157.48<br />
Problem:<br />
Solution:<br />
Project:<br />
Dead end waterlines result in stagnant water and degradation of water quality and require<br />
frequent flushing which is labor intensive and wastes water.<br />
Construct waterlines to create loops in distribution system and eliminate dead ends.<br />
Improvements to the Water System<br />
El Prado will be using these funds for several improvements to the water system including: finishing looping line<br />
project, well completion and development, and new water storage tank. The majority of the waterline looping<br />
project has been completed. Additional funds are needed to complete construction. NMFA MOU expired June 30,<br />
2012. No activity by CPB pending new MOU.<br />
County: Taos<br />
El Salto MDWCA<br />
CPB No: 2586-PG<br />
Funding:<br />
Project Amount<br />
NMFA-PG<br />
$37,500.00<br />
CPB Manager: Telmo, Andrea Grant Amount: $37,500.00<br />
Population Served by This Project 232 Loan Amount: $0.00<br />
Project Phase:<br />
Problem:<br />
Solution:<br />
Project:<br />
Planning Phase<br />
Fund Balance: $37,500.00<br />
Water system infrastructure is aging and undersized.<br />
Prepare PER to identify infrastructure needs, evaluate alternatives, and propose project to<br />
address water system needs.<br />
Completion of a PER for water system improvements<br />
PER reviewed and comments provided by CPB November 2012.<br />