Infrastructure Development Report - New Mexico Environment ...
Infrastructure Development Report - New Mexico Environment ...
Infrastructure Development Report - New Mexico Environment ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
County: Rio Arriba<br />
Ohkay Owingeh Housing Authority<br />
CPB No: TIF 12-23-PG PIF 1<br />
Funding:<br />
Project Amount<br />
TIF<br />
$40,000.00<br />
CPB Manager: Telmo, Andrea Grant Amount: $40,000.00<br />
Population Served by This Project 100 Loan Amount: $0.00<br />
Project Phase: Planning Phase Fund Balance: $40,000.00<br />
Problem: There is no infrastructure in place to support new housing development for low-income families<br />
and to alleviate over-crowding.<br />
Solution: Preliminary studies and design will be completed to provide infrastructure for an identified 15-acre<br />
site with 30 new homes.<br />
Project: Ohkay Owingeh Housing Authority - Planning and design for <strong>Infrastructure</strong><br />
Grant Agreement executed 9/24/2012.<br />
County: Rio Arriba<br />
Santa Clara, Pueblo of<br />
CPB No: TIF 12-15-PG PIF 3<br />
Funding:<br />
Project Amount<br />
TIF<br />
$120,000.00<br />
CPB Manager: Telmo, Andrea Grant Amount: $120,000.00<br />
Population Served by This Project 3,000 Loan Amount: $0.00<br />
Project Phase: Planning Phase Fund Balance: $120,000.00<br />
Problem: The Santa Clara Pueblo water system is in need of improvements to address water loss,<br />
inadequate infrastructure and fire protection, and poor water quality.<br />
Solution: Santa Clara Pueblo will complete a PER, ER, 40-Year Water Plan, Asset Inventory, 5-Year<br />
Financial Plan, and Hydrogeolgical Study to fully evaluate its water system current and future<br />
needs.<br />
Project: Pueblo of Santa Clara Water Planning and Capacity Building<br />
Grant Agreement executed 9/27/2012.<br />
County: Rio Arriba<br />
Santa Clara, Pueblo of<br />
CPB No: TIF 12-3-DC PIF 35<br />
Funding:<br />
Project Amount<br />
TIF<br />
$1,675,000.00<br />
CPB Manager: Telmo, Andrea Grant Amount: $1,675,000.00<br />
Population Served by This Project 3,000 Loan Amount: $0.00<br />
Project Phase: Design Phase Fund Balance: $1,675,000.00<br />
Problem:<br />
Solution:<br />
Project:<br />
The Santa Clara Pueblo wastewater collection system is in need of improvements to replace over<br />
40-year old deteriorating wastewater infrastructure.<br />
The Santa Clara Pueblo will replace and rehabilitate its wastewater collection system.<br />
Wastewater Collection System Improvements<br />
Grant Agreement executed 9/27/2012. CPB reviewed and provided comments on construction contract<br />
documents, plans and specifications on 10/2/2012.<br />
County: Rio Arriba<br />
Valley Estates MWSA<br />
CPB No: SAP 12-1364-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Telmo, Andrea Grant Amount: $50,000.00<br />
Population Served by This Project 185 Loan Amount: $0.00<br />
Project Phase: Planning Phase Fund Balance: $50,000.00<br />
Problem: The Valley Estates water system has uranium contamination in the water supply and is in need of<br />
various system improvements.<br />
Solution: The project will include a uranium treatment system, new water storage tank, new meters, and<br />
new booster pumps with VFDs.<br />
Project: to plan, design and construct improvements to the Valley Estates mutual water and sewer<br />
association water system in Espanola in Rio Arriba county.<br />
CPB reviewed and provided comments on PER Amendment on 12/14/2012.<br />
$0.00<br />