County: San Juan<br />
Bloomfield, City of<br />
CPB No: WTB-183<br />
Funding:<br />
Project Amount<br />
WTB<br />
$1,200,000.00<br />
CPB Manager: Bishop, David Grant Amount: $1,200,000.00<br />
Population Served by This Project 7,433 Loan Amount: $0.00<br />
Project Phase:<br />
Problem:<br />
Solution:<br />
Project:<br />
Grant Agreement Phase<br />
old water lines<br />
install new water lines<br />
Water Storage, Conveyance and Delivery<br />
Fund Balance: $1,015,167.83<br />
Install new waterlines and/or upgrade existing water lines along the US 64 corridor under the FHWA/DOT US 64<br />
Farmington to Bloomfield Corridor Phase 2 Project. Grant/loan for water line replacement project is to match<br />
federal funding from EPA STAG Grant. Project is currently about 90% constructed. 3/2/12 Sterling Brothers has<br />
installed all the utilities on the south portion of US64 (water mainlines, water laterals, sewer mainlines and sewer<br />
laterals). Pending items for the south end are final water tie ins. The schedule for the north US 64 utilities is slated<br />
on April 11, 2012. The north utilities are not as extensive as the south end. Utilities have been installed on the<br />
north portion of US64. 12/10/12 NMFA MOU expired June 30, 2012. No activity by CPB pending new MOU.<br />
County: San Juan<br />
Navajo Dam<br />
CPB No: RIP 2009-03<br />
Funding:<br />
Project Amount<br />
RIP Loans<br />
$550,000.00<br />
CPB Manager: Bishop, David Grant Amount: $0.00<br />
Population Served by This Project 458 Loan Amount: $550,000.00<br />
Project Phase:<br />
Problem:<br />
Solution:<br />
Project:<br />
Construction<br />
not meeting drinking water standards<br />
install treatment<br />
Water Treatment Plant & Surface Water Intake Improvements<br />
Fund Balance: $223,677.67<br />
Project to complete construction of new surface water treatment facility to meet Drinking water standards. Building<br />
to house treatment facility constructed with SAP money. Rip loan funding will be used to design and construct<br />
membrane treatment system. 8-22-12 CPB discussed breaking project into multiple contracts to complete the work<br />
since negotiations with contractors was unsuccessful. 9/10/12 Navajo DWC is getting quotes from three sources<br />
on the lift station, electrician, contact tank and Filter Tech will install filtration system. 11/7/12 DB low quotes for<br />
installation approved. 12/31/12 Installation of Filter Tech water treatment and ancillary equipment on going.<br />
County: San Juan<br />
Navajo Nation NAPI<br />
CPB No: TIF 12-13-DC PIF 9<br />
Funding:<br />
Project Amount<br />
TIF<br />
$813,347.00<br />
CPB Manager: Bishop, David Grant Amount: $813,347.00<br />
Population Served by This Project 0 Loan Amount: $0.00<br />
Project Phase: Grant Agreement Phase Fund Balance: $813,347.00<br />
Problem:<br />
Solution:<br />
Project:<br />
NAPI needs to divert 2,747 acre-ft. of return flows from the Navajo Indian Irrigation Project (NIIP)<br />
to supply agricultural-industrial water demands for NAPI.<br />
Construct Phase I which includes the Ojo Diversion structure, 18,000 feet of the West Lateral<br />
Pipeline and the Flour Mill Pipeline.<br />
Navajo Nation NAPI Winter Water Supply - Phase 1<br />
Construction of the Ojo Wash Diversion Facility, the West Lateral Pipeline and the Flour Mill Lateral Pipeline.<br />
9/27/12 no activity to date. 12/10/12 IGA has not been returned.<br />
41