County: Taos<br />

Upper Arroyo Hondo<br />

CPB No: 2864-PG<br />

Funding:<br />

Project Amount<br />

NMFA-PG<br />

$48,269.00<br />

CPB Manager: Telmo, Andrea Grant Amount: $48,269.00<br />

Population Served by This Project 195 Loan Amount: $0.00<br />

Project Phase: Planning Phase Fund Balance: $48,269.00<br />

Problem:<br />

Solution:<br />

Project:<br />

The Upper Arroyo Hondo DWCA is in need of a PER to address uranium removal from the water<br />

supply to meet US EPA and NM drinking water standards, installation of a new metering system,<br />

corrections/adjustments to water storage tank #1 to maximize usable storage volume, and<br />

modifications to wellhouse #2 for additional space to increase accessibility.<br />

Complete PER to identify and prioritize needs and determine most cost-effectve project.<br />

Preliminary Engineering <strong>Report</strong> for water system improvements<br />

PER kickoff/scoping meeting held 10/25/2012. Draft PER submitted to NMED for review 12/10/2012.<br />

County: Taos / Rio Arriba<br />

Chama, Village of<br />

CPB No: CWSRF 013L<br />

Funding:<br />

Project Amount<br />

CWSRF<br />

$100,000.00<br />

CPB Manager: Telmo, Andrea Grant Amount: $0.00<br />

Population Served by This Project 1,200 Loan Amount: $100,000.00<br />

Project Phase: Planning Phase Fund Balance: $100,000.00<br />

Problem:<br />

Solution:<br />

Project:<br />

The existing WWTP has been unable to consistently meet requirements set forth in the Village's<br />

National Pollution Discharge Elimination System (NPDES) Permit. The plant has numerous<br />

operational violations and has received 2 Administrative Orders from EPA.<br />

Plan, design and construct a new WWTP that will be in compliance with the NPDES permit.<br />

Plan & Design new WWTP<br />

Village has advertised RFP for engineering services for design of new WWTP. Proposals are due December 21,<br />

2012.<br />

County: Torrance<br />

Estancia, Town of<br />

CPB No: SAP 12-1375-STB<br />

Funding:<br />

Project Amount<br />

SAP Grants<br />

CPB Manager: DuBois, Stephanie Grant Amount: $12,766.00<br />

Population Served by This Project 1,655 Loan Amount: $0.00<br />

Project Phase: Planning Phase Fund Balance: $12,766.00<br />

Problem:<br />

Solution:<br />

Project:<br />

Existing wastewater treatment lagoons are aging and need repair.<br />

Replace existing aerators with new.<br />

to purchase and install sewer aerator pumps and a control panel and to upgrade the<br />

treatment system at the wastewater treatment facility in Estancia in Torrance county.<br />

$12,766 to purchase and install sewer aerator pumps and a control panel and to upgrade the treatment system at<br />

the wastewater treatment facility in Estancia in Torrance county. 7/9/12 City to purchase aerators once the grant has<br />

been issued and funding is available to reimburse cost. 8-10-12 grant agreement executed. As of 12-5-12 there has<br />

been no further activity.<br />

County: Torrance<br />

Willard, Village of<br />

CPB No: 2693-PG<br />

Funding:<br />

Project Amount<br />

NMFA-PG<br />

$0.00<br />

$50,000.00<br />

CPB Manager: Telmo, Andrea Grant Amount: $50,000.00<br />

Population Served by This Project 200 Loan Amount: $0.00<br />

Project Phase: Planning Phase Fund Balance: $50,000.00<br />

Problem:<br />

Solution:<br />

Project:<br />

<strong>Report</strong>ed problems with sewer service connections, effluent disposal sites/leachfields, and<br />

treatment site not in compliance with discharge permit.<br />

Complete PER to investigate the reported problems, determine their causes, and propose<br />

solutions for addressing these problems.<br />

Wastewater System Improvements PER<br />

Draft Corrective Action Plan submitted to CPB and GWQB 10/8/2012. Field investigation work completed<br />

December 2012 and Draft Technical Memo submitted to CPB and GWQB 12/10/2012.<br />