County: San Juan<br />

Northstar (Formerly Southside WUA)<br />

CPB No: WTB-94<br />

Funding:<br />

Project Amount<br />

WTB<br />

$2,000,000.00<br />

CPB Manager: Bishop, David Grant Amount: $2,000,000.00<br />

Population Served by This Project 3,976 Loan Amount: $0.00<br />

Project Phase:<br />

Problem:<br />

Solution:<br />

Project:<br />

Grant Agreement Phase<br />

water system issues<br />

install tank, lines, pump station<br />

Water Conservation and Reuse Project<br />

Fund Balance: $1,975,000.00<br />

WTB #70 ($1,432,552) and WTB #94 ($2M) design and construction of water system improvements for the<br />

Animas Regional Domestic Water Coalition, 5/26/10 CPB reviews and approves plans and specifications for the<br />

construction of 16 mi of water pipeline, 2 tanks, pump station, ARV's and appurtenances.5/25/12 still working on<br />

finalizing close out documents. About $100,000 is owed to contractor Merryman Excavation, but have not been<br />

able to contact the contractor. P&S for Ph 2 have been completed by SMA. However, there has been a falling out<br />

with SMA. Northstar will hire Cheney Walter Echols for the bidding and construction management of Ph 2 by<br />

summer 2012. Estimated construction costs for Ph 2 is about $1.8M. As of 6-30-12 contract with NMFA expired.<br />

NMFA will now administer project. 12/10/12 NMFA MOU expired June 30, 2012. No activity by CPB pending new<br />

MOU.<br />

County: San Juan<br />

San Juan, County of<br />

CPB No: CWSRF 015G<br />

Funding:<br />

Project Amount<br />

CWSRF<br />

$90,000.00<br />

CPB Manager: Bishop, David Loan Amount: $0.00<br />

Population Served by This Project Grant Amount: $90,000.00<br />

Project Phase: Planning Phase Fund Balance: $90,000.00<br />

Problem:<br />

Solution:<br />

Project:<br />

Lower Valley Mutual Domestic Water Association must cease discharging to existing lagoon.<br />

Construct lift station and force main to existing Valley Water and Sanitation sewer lift station.<br />

Conceptual engineering and final design of the Lower Valley decommissioning and Lift<br />

Station Hookup project<br />

Project is to plans and design a sewer collection system, lift station and force main. 10/4/12 Draft environmental<br />

information document (EID) has been reviewed by CPB. 11/2/12 CPB provided comments on PER to Wilson & Co.<br />

12/6/12 CPB reviewing Wilson & Co final PER; public hearing scheduled for 12/12/12.<br />

County: San Juan<br />

San Juan, County of<br />

CPB No: CWSRF 015L<br />

Funding:<br />

Project Amount<br />

CWSRF<br />

$86,000.00<br />

CPB Manager: Bishop, David Grant Amount: $0.00<br />

Population Served by This Project 145 Loan Amount: $86,000.00<br />

Project Phase: Planning Phase Fund Balance: $86,000.00<br />

Problem:<br />

Solution:<br />

Project:<br />

Lower Valley Mutual Domestic Water Association must cease discharging to existing lagoon.<br />

Construct lift station and force main to existing Valley Water and Sanitation sewer lift station.<br />

Conceptual engineering and final design of the Lower Valley decommissioning and Lift<br />

Station Hookup project<br />

Project is to plans and design a sewer collection system, lift station and force main. 10/4/12 Draft environmental<br />

information document (EID) has been reviewed by CPB. 11/2/12 CPB provided comments on PER to Wilson & Co.<br />

12/6/12 CPB reviewing Wilson & Co final PER; public hearing scheduled for 12/12/12.<br />