County: Taos<br />
Taos, County of<br />
CPB Manager: Telmo, Andrea<br />
CPB No: RIP 2009-01<br />
Funding:<br />
Project Amount<br />
Grant Amount:<br />
RIP Loans<br />
$525,000.00<br />
Population Served by This Project 32,937 Loan Amount: $500,000.00<br />
Project Phase: Design Phase Fund Balance: $442,024.48<br />
Problem:<br />
Solution:<br />
Project:<br />
Taos County would like to expand their solid waste operations and provide recycling facilities to<br />
better serve the entire County.<br />
Construct new solid waste and recycling facilities.<br />
to plan, design and construct a new facility for the Taos County Solid Waste Department<br />
$500,000 RIP loan to plan, design and construct a new facility for the Taos County Solid Waste Department.<br />
Project has been designed, but additional funds are needed for construction.<br />
County: Taos<br />
Taos, Town of<br />
CPB Manager: Kahl, Judi<br />
CPB No: ARRA CWSRF 15L<br />
Funding:<br />
Project Amount<br />
Grant Amount:<br />
CWSRF<br />
$0.00<br />
$1,200,000.00<br />
Population Served by This Project 5,716 Loan Amount: $1,200,000.00<br />
Project Phase: Construction Fund Balance: $19,668.86<br />
Problem:<br />
Solution:<br />
Project:<br />
$0.00<br />
The town of Taos needed upgrades to their WWTP to meet their permit limits.<br />
The town rebuilt portions of their existing plant and added a membrane filtration system and solar<br />
panels.<br />
Phase 2 & 3 WWTP upgrades to wastewater treatment plant<br />
Project construction is complete. There will be one additional pay request for project closeout. Final pay request<br />
has been received and is ready for payment upon receipt of closeout documents. 12/3/12.<br />
County: Taos<br />
Tres Piedras MDWCA<br />
CPB No: 2749-PG<br />
Funding:<br />
Project Amount<br />
NMFA-PG<br />
$50,000.00<br />
CPB Manager: Telmo, Andrea Grant Amount: $50,000.00<br />
Population Served by This Project 315 Loan Amount: $0.00<br />
Project Phase: Planning Phase Fund Balance: $50,000.00<br />
Problem:<br />
Solution:<br />
Project:<br />
Water system is in need of improvements, including but not limited to a new water supply well,<br />
replacement of aging and/or undersized waterlines, construction of new waterlines to expand the<br />
service area, and distribution system improvements to address areas with low water pressure.<br />
Complete PER to identify and prioritize needs and determine most cost-effective project.<br />
Preliminary Engineering <strong>Report</strong> for water system improvements.<br />
RFP advertised 10/11/12. Proposals due 11/13/12. Selection of engineer in progress.<br />
County: Taos<br />
Union Del Llano MDWCA<br />
CPB No: 2651-PG<br />
Funding:<br />
Project Amount<br />
NMFA-PG<br />
$50,000.00<br />
CPB Manager: Telmo, Andrea Grant Amount: $50,000.00<br />
Population Served by This Project 484 Loan Amount: $0.00<br />
Project Phase: Planning Phase Fund Balance: $50,000.00<br />
Problem: Llano San Juan MDWCA & Cuchilla del Llano MDWCA have aging, deteriorating, and undersized<br />
infrastructure.<br />
Solution: Llano San Juan & Cuchilla del Llano are merging to form Union del Llano; a PER will be<br />
completed to identify the infrastructure needs and propose a project to address these needs.<br />
Project: Water System Improvements PER<br />
PER scoping/kickoff meeting held 4/10/2012. PER in progress. 12/19/2012<br />
63