County: Otero CPB No: SAP 12-1617-STB Funding: SAP Grants<br />

Twin Forks MDWCA Project Amount $0.00<br />

CPB Manager: Telmo, Andrea Grant Amount: $50,000.00<br />

Population Served by This Project 1,090 Loan Amount: $0.00<br />

Project Phase: Construction Fund Balance: $50,000.00<br />

Problem: Twin Forks MDWCA is in need of infrastructure improvements to replace existing deteriorating<br />

and undersize infrastructure. Twin Forks is currently under an Administrative Compliance Order to<br />

reduce water loss in the system and provide adequate treatment for spring (GWUDI) water sources<br />

in use.<br />

Solution: Conduct a water audit to determine where the greatest leakage in the water system is occurring<br />

and construct improvements to reduce leakage.<br />

Project: to plan, design, equip and construct water system improvements for the Twin Forks<br />

mutual domestic water consumers association in Otero county.<br />

Otero County is project manager and fiscal agent. Tank #3 collapsed 9/13/2012. Twin Forks obtained emergency<br />

loan in amount of $51,187.43 from Board of Finance on 9/21/2012 for tank replacement. Tank plans approved by<br />

CPB 10/11/2012 and DWB 10/29/2012. CPB reviewed and provided comments on Water Loss Remediation<br />

<strong>Report</strong> and SCADA Bid Documents on 11/27/2012. Pre-construction conference for Tank 3 replacement held<br />

12/3/2012.<br />

County: Quay<br />

Tucumcari, City of<br />

CPB No: 2728-DW<br />

Funding:<br />

Project Amount<br />

NMFA-DW<br />

$1,594,790.00<br />

CPB Manager: Kahl, Judi Grant Amount: $1,594,790.00<br />

Population Served by This Project 5,363 Loan Amount: $0.00<br />

Project Phase: Ad/Bid Phase Fund Balance: $1,594,790.00<br />

Problem:<br />

Solution:<br />

Project:<br />

The City of Tucumcari requires additional storage to meet water demand and fire flow<br />

requirements.<br />

A new 400,000 gallon tank has been designed.<br />

Project includes a new water tank and appurtenances for the City of Tucumcari.<br />

Plans and specifications were approved on 11/16/2012. NMFA approved them on 12/5/12. Project should be<br />

bidding shortly. 12-5-12<br />

County: Quay<br />

Tucumcari, City of<br />

CPB No: SAP 12-1361-STB<br />

Funding:<br />

Project Amount<br />

SAP Grants<br />

CPB Manager: Kahl, Judi Grant Amount: $150,000.00<br />

Population Served by This Project 5,363 Loan Amount: $0.00<br />

Project Phase: Ad/Bid Phase Fund Balance: $150,000.00<br />

Problem:<br />

Solution:<br />

Project:<br />

$0.00<br />

Existing trash collection trucks are old and require excessive maintenance and repair.<br />

Purchase new trucks<br />

to purchase and equip trash collection trucks for the solid waste department in Tucumcari<br />

in Quay county.<br />

to purchase and equip trash collection trucks for the solid waste department in Tucumcari in Quay county. 7/9/12<br />

City will need to advertise request for quotes on trash collection trucks. 8/21/12 City has prepared request for bids<br />

on trash trucks, CPB has reviewed and approved RFB. Tucumcari bid the trucks out twice and the second time<br />

received acceptable bids. CPB approved the bids on 10/26/2012 and the City is proceeding with the internal<br />

process necessary to purchase the trucks. 12/5/12.<br />