County: McKinley/San Juan<br />
Navajo Nation<br />
CPB No: SAP 09-3721-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Bishop, David Grant Amount: $5,375,244.00<br />
Population Served by This Project 25,876 Loan Amount: $0.00<br />
Project Phase: Construction Fund Balance: $4,944,124.99<br />
Problem:<br />
Solution:<br />
Project:<br />
Numerous individual water systems lack recourses to operate and maintain systems.<br />
Regionalize water systems.<br />
Regional Water Distribution Project - Cutter Lateral Phase 3<br />
for the Navajo Nation division of natural resources department of water resources water management branch for a<br />
regional water distribution project in Rio Arriba, Sandoval, McKinley, San Juan and Cibola counties. 12/12/11<br />
Awaiting close out documents and final change order for Ph. 2. 1/13/12 CPB reviews and approves revised P&S<br />
for Ph. 3. 2/14/12 CPB reviews and approves Addendum #1 & #2. 2/21/12 Bids were opened for Ph. 3 with Samcon,<br />
Inc. being the apparent low bidder. All bid tabs and supporting documentation will be submitted to support<br />
concurrence of low bidder. 2/23/12 CPB approves CO#1 for additional pipe material and storage. 5/31/12 NTP<br />
given and construction under way. 12/18/12 Construction of Phs 3 ongoing and 45% complete.<br />
County: McKinley/San Juan<br />
Navajo Nation<br />
CPB No: SAP 09-3802-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Bishop, David Grant Amount: $2,400,000.00<br />
Population Served by This Project 25,876 Loan Amount: $0.00<br />
Project Phase: Construction Fund Balance: $2,400,000.00<br />
Problem:<br />
Solution:<br />
Project:<br />
Numerous individual water systems lack recourses to operate and maintain systems.<br />
Regionalize water systems.<br />
Cutter Lateral Phase 3<br />
for the Navajo Nation division of natural resources department of water resources water management branch for a<br />
regional water distribution project in Rio Arriba, Sandoval, McKinley, San Juan and Cibola counties. 12/12/11<br />
Awaiting close out documents and final change order for Ph 2. 1/13/12 CPB reviews and approves revised P&S for<br />
Ph 3. 2/14/12 CPB reviews and approves Addendum #1 & #2. 2/21/12 Bids were opened for Ph 3 with Samcon,<br />
Inc being the apparent low bidder. All bid tabs and supporting documentation will be submitted to support<br />
concurrence of low bidder. 2/23/12 CPB approves CO#1 for additional pipe material and storage. 5/31/12 NTP<br />
given and construction under way. 12/18/12 Construction of Phs 3 ongoing and 45% complete.<br />
County: McKinley/San Juan<br />
Navajo Nation<br />
CPB No: SAP 12-1578-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Bishop, David Grant Amount: $100,000.00<br />
Population Served by This Project 310 Loan Amount: $0.00<br />
Project Phase: Grant Agreement Phase Fund Balance: $100,000.00<br />
Problem:<br />
Solution:<br />
Project:<br />
Aging infrastructure requires excessive operational and maintenance costs.<br />
Replace infrastructure<br />
to plan, design and construct a water distribution system in the To'hajiilee chapter of the<br />
Navajo Nation in Bernalillo county.<br />
to plan, design and construct a water distribution system in the To'hajiilee chapter of the Navajo Nation in Bernalillo<br />
county. 7/9/12 Need RFP for engineering services. 12/10/12 grant agreement not yet returned.<br />
$0.00<br />
$0.00<br />
$0.00<br />
28