County: Sandoval<br />
Cuba, Village of<br />
CPB No: SAP 09-3811-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Bishop, David Grant Amount: $225,000.00<br />
Population Served by This Project 731 Loan Amount: $0.00<br />
Project Phase: Construction Fund Balance: $225,000.00<br />
Problem:<br />
Solution:<br />
Project:<br />
Existing wastewater treatment plant does not meet NPDES permit requirements.<br />
Upgrade wastewater treatment plant so effluent will meet NPDES permit requirements.<br />
Wastewater Treatment Plant Improvements<br />
to plan, design, construct and improve the wastewater treatment system in Cuba in Sandoval county. 1/23/12 CPB<br />
issues FONSI and Final Determination Letter. 2/29/12 CPB reviews and approves Revised Plans & Specs to<br />
advertise for bids. Bids were advertised 2/12/12, prebid conference will be on 2/28/12 and bids will be opened on<br />
3/13/12. 6/5/12 Low bidder is TLC; Given NTP on 4/30/12. 12/10/12 Construction is 56% complete; Gannett<br />
Fleming is 30% complete on PER for Phase 2.<br />
County: Sandoval<br />
Cuba, Village of<br />
CPB No: SAP 12-1367-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Bishop, David Grant Amount: $200,000.00<br />
Population Served by This Project 731 Loan Amount: $0.00<br />
Project Phase: Planning Phase Fund Balance: $200,000.00<br />
Problem:<br />
Solution:<br />
Project:<br />
Existing wastewater treatment plant does not meet NPDES permit requirements.<br />
Upgrade wastewater treatment plant so effluent will meet NPDES permit requirements.<br />
to plan, design and construct a wastewater treatment plant in Cuba in Sandoval county.<br />
to plan, design, construct and improve the wastewater treatment system in Cuba in Sandoval county. 6/5/12<br />
Gannett Fleming selected for Phase 2 solids handling. 12/10/12 Gannett Fleming is 30% complete on PER for<br />
Phase 2.<br />
County: Sandoval<br />
Cuba, Village of<br />
CPB No: SAP 12-1634-GF<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Bishop, David Grant Amount: $50,000.00<br />
Population Served by This Project 731 Loan Amount: $0.00<br />
Project Phase:<br />
Problem:<br />
Solution:<br />
Project:<br />
Planning Phase<br />
Aging infrastructure.<br />
Replace aging infrastructure.<br />
for water treatment and well improvements in Cuba in Sandoval county.<br />
$0.00<br />
$0.00<br />
$0.00<br />
Fund Balance: $50,000.00<br />
to plan, design and construct improvements to the water treatment plant and wells in Cuba in Sandoval County.<br />
11/22/10 per Vandora Casados the following task expenditures are proposed with this funding: Interior Cleaning of<br />
Two Storage Tanks, Cleaning of Clear Well, Purchase <strong>New</strong> Pumps for Well, Replacement of Pumps in Well<br />
(including installing pumps, wiring, casing inspection etc), Replace Piping for Disinfection System, Replace Filter<br />
Media at Water Treatment Plant. 11/22/10 sent project status to LFC. 1/26/12 Cuba requests reauthorization of<br />
grant. 5/30/12 expiration date now 2014. <strong>New</strong> Grant agreement issued 12-1634-GF. 12/10/12 no progress.<br />
48