<strong>2012</strong> ANNUAL REPORT<br />
Road Committee <strong>Report</strong><br />
The Road Committee had six regular meetings in <strong>2012</strong>.<br />
The Bond funds approved in 2011 to rehabilitate the paved section <strong>of</strong> the Basin Road and<br />
the section <strong>of</strong> Parker Head Road from Egret Point south through Parker Head Village to connect<br />
with the rebuilt curve at Foster’s driveway are currently being used for engineering costs. The<br />
preliminary design <strong>of</strong> the road section going through Parker Head Village was completed and a<br />
public hearing was held in August which resulted in more design review and research. Soil borings<br />
and final design are currently planned to be ready for the final public hearing in June 2013.<br />
James Lewis resigned this year. The Committee wishes to thank Jimmy for his service and<br />
insight. Richard Wenzel was appointed in December <strong>2012</strong> to fill this vacancy.<br />
The Committee recommends the funds for the 2014 Capital Improvement Program be approved<br />
and the Road Commissioner’s proposed road maintenance budget be approved.<br />
WORK COMPLETED FROM JANUARY TO DECEMBER <strong>2012</strong><br />
Overlays <strong>of</strong> existing paved roads:<br />
None<br />
Gravel surface rehabilitation:<br />
Section <strong>of</strong> Cranberry Point Road<br />
Culverts upgraded, slip sleeve lined or new installation:<br />
Blacks Landing Road (culvert replacement)<br />
Clifford Road (culvert lining)<br />
Fiddlers Reach Road (culvert lining)<br />
<br />
Road washout repairs:<br />
Sections <strong>of</strong> Sam Day Hill Road<br />
Sections <strong>of</strong> Cranberry Point Road<br />
Sections <strong>of</strong> Stoneybrook Road<br />
Tree trimming:<br />
Sections <strong>of</strong> Sebasco Road<br />
Sections <strong>of</strong> Alliquippa Road<br />
Gravel roads were graded once and several a second time this year.<br />
136<br />
(L)<br />
Road<br />
Commissioner<br />
Curtis Doughty<br />
meets with DOT<br />
concerning<br />
Popham erosion<br />
(R)<br />
Hank Cook<br />
Photo