Road Committee <strong>Report</strong><br />

The Road Committee had six regular meetings in <strong>2012</strong>.<br />

The Bond funds approved in 2011 to rehabilitate the paved section <strong>of</strong> the Basin Road and<br />

the section <strong>of</strong> Parker Head Road from Egret Point south through Parker Head Village to connect<br />

with the rebuilt curve at Foster’s driveway are currently being used for engineering costs. The<br />

preliminary design <strong>of</strong> the road section going through Parker Head Village was completed and a<br />

public hearing was held in August which resulted in more design review and research. Soil borings<br />

and final design are currently planned to be ready for the final public hearing in June 2013.<br />

James Lewis resigned this year. The Committee wishes to thank Jimmy for his service and<br />

insight. Richard Wenzel was appointed in December <strong>2012</strong> to fill this vacancy.<br />

The Committee recommends the funds for the 2014 Capital Improvement Program be approved<br />

and the Road Commissioner’s proposed road maintenance budget be approved.<br />

WORK COMPLETED FROM JANUARY TO DECEMBER <strong>2012</strong><br />

Overlays <strong>of</strong> existing paved roads:<br />

None<br />

Gravel surface rehabilitation:<br />

Section <strong>of</strong> Cranberry Point Road<br />

Culverts upgraded, slip sleeve lined or new installation:<br />

Blacks Landing Road (culvert replacement)<br />

Clifford Road (culvert lining)<br />

Fiddlers Reach Road (culvert lining)<br />

<br />

Road washout repairs:<br />

Sections <strong>of</strong> Sam Day Hill Road<br />

Sections <strong>of</strong> Cranberry Point Road<br />

Sections <strong>of</strong> Stoneybrook Road<br />

Tree trimming:<br />

Sections <strong>of</strong> Sebasco Road<br />

Sections <strong>of</strong> Alliquippa Road<br />

Gravel roads were graded once and several a second time this year.<br />

136<br />

(L)<br />

Road<br />

Commissioner<br />

Curtis Doughty<br />

meets with DOT<br />

concerning<br />

Popham erosion<br />

(R)<br />

Hank Cook<br />

Photo