TOWN OF PHIPPSBURG<br />
ROAD CAPITAL IMPROVEMENT PLAN (Rolling Five Year Plan)<br />
2014<br />
Parker Head Road - Upgrade the 36 inch culvert between Egret Point Road and Young’s Lane<br />
with a 48 inch culvert and raise the grade <strong>of</strong> the traveled way three feet (estimated distance is<br />
1,000 feet). Rebuild the section through Parker Head Village. Overlay .7 miles from Youngs<br />
Lane south through Parker Head Village towards Cox’s Head Road (Bond funding)<br />
Sebasco Road - Upgrade the base drainage and ditches on a 500 foot section east <strong>of</strong> Merritt<br />
Mountain Road where the water runs across. Rebuild the base and pavement.<br />
Basin Road - Rebuild .4 miles <strong>of</strong> the paved section from Route 209 to Devils Highway (Bond<br />
funding).<br />
2015<br />
Sebasco Road - Overlay first section <strong>of</strong> 1.2 miles from Route 209 to Kenyon Way.<br />
2016<br />
Small Point Road - Overlay second half section <strong>of</strong> 0.4 miles from Branch Road to end <strong>of</strong><br />
pavement.<br />
2017<br />
Parker Head Road - Rebuild 0.4 mile section upgrading culverts and drainage structures and<br />
overlay pavement from the Center Pond bridge going south.<br />
2018<br />
Sebasco Road - Overlay 1.2 miles from Kenyon Way to Blacks Landing Road.<br />
NOTE: If funds are not approved for a planned project or are not adequate to cover the cost <strong>of</strong><br />
the project, the project will be moved ahead to the next year.<br />
Russ<br />
Alexander<br />
at<br />
Hazardous<br />
Waste<br />
Day<br />
Respectfully submitted,<br />
Leslie H. Smith, Chair<br />
137