<strong>2012</strong> ANNUAL REPORT<br />

to assess a renovation at seventy five (75.00) dollars per square foot and new construction at<br />

one hundred twenty five (125.00) dollars per square foot. The fee for construction commenced<br />

before a permit is issued shall be twice the normal fee.<br />

Section 16.A.5.<br />

No permit shall be issued for new construction until a plumbing permit has been obtained for<br />

the treatment and disposal <strong>of</strong> the sanitary wastes when such is required by the planned use <strong>of</strong><br />

the structure.<br />

If the proposed use will require the installation or expansion <strong>of</strong> a subsurface wastewater<br />

disposal system, a valid permit from the LPI shall be required.<br />

Section 16.A.6.<br />

6. No permit shall be issued for additional bedrooms or uses until the applicant demonstrates<br />

that the waste water system is lawful for both the existing structure and the proposed changes.<br />

Section 16.B.1.<br />

1. All dwellings and mobile homes shall be erected on solid ledge or foundation walls not less<br />

than seven inches thick and carried not less than 12 inches below the frost line, or upon a concrete<br />

slab not less than six inches thick, or upon pressure treated or concrete posts that extend to<br />

solid ledge or to at least five four feet into the earth.<br />

Section 16.B.3.b.<br />

b. A fire suppression sprinkler shall be installed at the common points <strong>of</strong> ignition including, but<br />

not limited to, furnaces, water heaters, kitchens, wood stoves/ fireplaces. Such systems may be<br />

supplied by the domestic water supply.<br />

And re-letter remaining subsections.<br />

Section 16.B.3. subsections c., d., e. and g. (changes “must” to “shall )<br />

c. b. There must shall be two (2) inches or more clearance between combustible materials and<br />

masonry chimneys.<br />

d. c. All masonry chimneys must shall be lined.<br />

e. d. All hallways must shall have a minimum finished width <strong>of</strong> thirty-six (36) inches.<br />

g. f. Walls and doors between attached garages and living spaces must shall be built <strong>of</strong> fire<br />

shield material with a one (1) hour rating.<br />

Section 16.B.3.j.<br />

j. All building shall conform to the Maine Model Building Code (IBC 2003, IRC 2003) as<br />

amended (Title 10 Chapter 1101, Maine Model Building Code).<br />

i. All building shall conform to Title 10 Chapter 1101, Maine Model Building Code (IBC 2003<br />

or IRC 2003) as amended.<br />