10.07.2014 Views

Owner's Manual - Smarthome

Owner's Manual - Smarthome

Owner's Manual - Smarthome

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

76 I-Wave PE653-PE953 Installation Guide<br />

Problem What to do Reference/Procedure<br />

The 2-speed pump will not<br />

operate in 2-Speed mode<br />

Verify that all wiring<br />

connections are correct<br />

and that all terminals and<br />

splices are secure.<br />

1. Refer to the Wiring Instructions in Section 3.<br />

2. Find the Wiring Diagram that is the most like the<br />

installation starting on page 16.<br />

3. Verify that the system is wired according to the<br />

diagram.<br />

Verify that the correct<br />

voltage is present at<br />

terminals 1 and 2.<br />

1. Use a meter and verify voltage output from the breaker<br />

(should be 240 VAC).<br />

2. Use a meter to verify that the voltage at terminals 1 and<br />

2 is 240 VAC.<br />

3. Turn ON circuit #1 on the PE653 using either the<br />

Hand-Held controller or the Circuit ON/OFF switch on<br />

the PE653.<br />

4. Use a meter and verify voltage at pump terminals.<br />

Verify that your system is<br />

configured for a 2-speed<br />

pump.<br />

NOTE: L2 must return to the second pole on the breaker<br />

for 240 VAC to be present.<br />

5. Verify that terminal 3 on the PE653 is connected to the<br />

‘HIGH’ speed terminal at the pump.<br />

6. Verify that terminal 4 on the PE653 is connected to the<br />

‘LOW’ speed terminal at the pump.<br />

7. Verify that the ‘COMMON’ terminal at the pump is<br />

connected to L2 at the breaker panel.<br />

8. Refer to “Configuring for a 1-Speed or 2-Speed Pump”<br />

starting on page 44.<br />

Contact your pump service company for assistance with the pump.<br />

Problem What to do Reference/Procedure<br />

High speed and low speed<br />

circuits 1 & 2) turn ON<br />

together when the pump is<br />

turned ON.<br />

Confirm that the system is<br />

programmed for a 2-speed<br />

pump.<br />

1. Press any release any button on the PE953 Hand-held<br />

Controller to wake it up.<br />

2. Verify that the PPE953 displays “HI SPD 1” or “LO<br />

SPD 2” in the upper left hand corner of the screen.<br />

3. Refer to the illustration on page 41.<br />

Reprogram for 2-speed<br />

pump operation.<br />

Refer to “Configuring for a 1-Speed or 2-Speed Pump”<br />

starting on page 44.<br />

Copyright © 2010 Intermatic, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!