Owner's Manual - Smarthome
Owner's Manual - Smarthome
Owner's Manual - Smarthome
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
76 I-Wave PE653-PE953 Installation Guide<br />
Problem What to do Reference/Procedure<br />
The 2-speed pump will not<br />
operate in 2-Speed mode<br />
Verify that all wiring<br />
connections are correct<br />
and that all terminals and<br />
splices are secure.<br />
1. Refer to the Wiring Instructions in Section 3.<br />
2. Find the Wiring Diagram that is the most like the<br />
installation starting on page 16.<br />
3. Verify that the system is wired according to the<br />
diagram.<br />
Verify that the correct<br />
voltage is present at<br />
terminals 1 and 2.<br />
1. Use a meter and verify voltage output from the breaker<br />
(should be 240 VAC).<br />
2. Use a meter to verify that the voltage at terminals 1 and<br />
2 is 240 VAC.<br />
3. Turn ON circuit #1 on the PE653 using either the<br />
Hand-Held controller or the Circuit ON/OFF switch on<br />
the PE653.<br />
4. Use a meter and verify voltage at pump terminals.<br />
Verify that your system is<br />
configured for a 2-speed<br />
pump.<br />
NOTE: L2 must return to the second pole on the breaker<br />
for 240 VAC to be present.<br />
5. Verify that terminal 3 on the PE653 is connected to the<br />
‘HIGH’ speed terminal at the pump.<br />
6. Verify that terminal 4 on the PE653 is connected to the<br />
‘LOW’ speed terminal at the pump.<br />
7. Verify that the ‘COMMON’ terminal at the pump is<br />
connected to L2 at the breaker panel.<br />
8. Refer to “Configuring for a 1-Speed or 2-Speed Pump”<br />
starting on page 44.<br />
Contact your pump service company for assistance with the pump.<br />
Problem What to do Reference/Procedure<br />
High speed and low speed<br />
circuits 1 & 2) turn ON<br />
together when the pump is<br />
turned ON.<br />
Confirm that the system is<br />
programmed for a 2-speed<br />
pump.<br />
1. Press any release any button on the PE953 Hand-held<br />
Controller to wake it up.<br />
2. Verify that the PPE953 displays “HI SPD 1” or “LO<br />
SPD 2” in the upper left hand corner of the screen.<br />
3. Refer to the illustration on page 41.<br />
Reprogram for 2-speed<br />
pump operation.<br />
Refer to “Configuring for a 1-Speed or 2-Speed Pump”<br />
starting on page 44.<br />
Copyright © 2010 Intermatic, Inc.