26.08.2014 Views

Risk-Based Inspection

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.1 Key Elements of an RBI Program<br />

Key elements that should exist in any RBI program include:<br />

a) management systems for maintaining documentation, personnel<br />

qualifications, data requirements, consistency of the program and<br />

analysis updates;<br />

b) documented method for POF determination;<br />

c) documented method for COF determination;<br />

d) documented methodology for managing risk through inspection,<br />

process control and other mitigation activities.<br />

However, all the elements outlined in Section 1 should be adequately<br />

addressed in all RBI applications, in accordance with the recommended<br />

practices in this document.<br />

API 580<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!