26.08.2014 Views

Risk-Based Inspection

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

12.8 <strong>Risk</strong> Management 风 险 管 理<br />

<strong>Based</strong> on the ranking of items and the risk threshold, the risk management<br />

process begins. For risks that are judged acceptable, no mitigation may be<br />

required and no further action necessary. For risks considered unacceptable<br />

and therefore requiring risk mitigation, there are various mitigation categories<br />

that should be considered.<br />

被 认 为 是 不 可 接 受 的 风 险 , 缓 解 类 别 有<br />

a) Decommission - Is the equipment really necessary to support unit operation?<br />

使 退 役 ( 冗 余 设 备 ).<br />

b) <strong>Inspection</strong>/ Condition Monitoring - Can a cost-effective inspection program,<br />

with repair as indicated by the inspection results, be implemented that will<br />

reduce risks to an acceptable level?<br />

经 济 有 效 的 检 查 计 划 与 由 检 验 结 果 标 出 维 修 项 .<br />

Probability Mitigation- with repair as indicated by the inspection results?<br />

API 580<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!