26.08.2014 Views

Risk-Based Inspection

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

17.4 Time Frame 时 段<br />

The level of risk is usually a function of time. This either is as a result of the (1)<br />

time dependence of a damage mechanism, or simply (2) the potential for<br />

changes in the operation of equipment. Therefore, the time frame over which<br />

the RBI analysis is applicable should be defined and captured in the final<br />

documentation. This will permit tracking and management of risk effectively<br />

over time.<br />

风 险 水 平 通 常 是 时 间 的 函 数 ( 损 伤 机 理 的 恶 化 或 操 作 导 致 的 变 化 ), 所 以 风 险 评 估<br />

必 须 设 置 有 效 时 间 段 . 这 将 允 许 在 时 间 段 里 , 有 效 跟 踪 和 管 理 风 险 .<br />

API 580<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!