26.08.2014 Views

Risk-Based Inspection

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.6.2 Using RBI to Establish <strong>Inspection</strong> Plans and Priorities<br />

建 立 检 验 计 划 和 优 先 事 项<br />

The primary product of an RBI effort should be an inspection plan for each<br />

equipment item evaluated. RBI is a logical and structured process for planning<br />

and evaluating inspection activities for pressure equipment. The inspection<br />

plan should detail the unmitigated risk related to the current operation. For<br />

risks considered unacceptable, the plan should contain the mitigation actions<br />

that are recommended to reduce the unmitigated risk to acceptable levels.<br />

检 验 计 划 应 详 细 说 明 当 前 操 作 中 的 设 备 可 能 存 在 的 未 缓 和 风 险 . 对 于 存 在 不 可 接<br />

受 的 风 险 的 设 备 , 该 计 划 应 包 含 减 缓 行 动 以 减 少 风 险 到 可 接 受 的 水 平<br />

API 580<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!