26.08.2014 Views

Risk-Based Inspection

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15.3.3 After Implementation of <strong>Risk</strong> Mitigation Strategies<br />

风 险 缓 解 策 略 实 施 后<br />

Once a mitigation strategy is implemented, it is prudent to determine how<br />

effective the strategy was in reducing the risk to an acceptable level. This<br />

should be reflected in a reassessment of the risk and appropriate update in<br />

the documentation.<br />

一 旦 实 现 了 一 个 缓 解 策 略 , 谨 慎 的 做 法 是 确 定 缓 解 策 略 对 风 险 降 低 的 有 效 性 . 重<br />

估 的 结 果 应 当 档 案 , 如 有 必 要 改 进 缓 解 策 略 .<br />

API 580<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!