When performing risk analysis across different equipment, a single site or<br />

multiple sites, the user is cautioned about comparing specific results unless<br />

the same or very similar RBI methodologies and assumptions were applied.<br />

The user is also cautioned against drawing conclusions about different results<br />

when different methodologies are used to evaluate the same piece of<br />

equipment.<br />

The RBI process, shown in the simplified block diagram in Figure 4, depicts<br />

the essential elements of inspection planning based on risk analysis. This<br />

diagram is applicable to Figure 3 regardless of which RBI approach is applied,<br />

i.e. each of the essential elements shown in Figure 4 are necessary for a<br />

complete RBI program regardless of approach (qualitative, semi-quantitative,<br />

or quantitative).<br />

分 析 结 果 共 享 与 对 比 , 值 得 注 意 :<br />

不 同 的 设 备 ( 所 在 地 ) 分 析 或 不 同 的 方 法 被 用 来 分 析 同 一 台 设 备 时 , 所 得 到 的 分<br />

析 结 果 , 除 非 相 同 或 非 常 相 似 的 方 法 和 假 设 被 运 用 可 能 有 明 显 差 异 .<br />

API 580<br />