26.08.2014 Views

Risk-Based Inspection

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

At the conclusion of the planning portion of the development of the RBI program,<br />

the following should have been completed:<br />

以 下 为 整 个 计 划 必 须 完 成 的 前 期 规 划 点<br />

a) establish the objectives of the risk analysis, 建 立 风 险 分 析 的 目 标<br />

b) identify the physical boundaries, 识 别 物 理 边 界<br />

c) identify the operating boundaries, 确 定 操 作 范 围<br />

d) develop screening questions and criteria consistent with the objectives of the<br />

analysis and identified physical and operating boundaries.<br />

根 据 上 述 三 点 , 开 发 筛 选 问 题 和 一 致 准 据<br />

API 580<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!