26.08.2014 Views

Risk-Based Inspection

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

15.1 RBI Reassessments 重 估<br />

RBI is a dynamic tool that can provide current and projected future risk<br />

evaluations. However, these evaluations are based on data and knowledge at<br />

the time of the assessment. As time goes by, changes are inevitable and the<br />

results from the RBI assessment should be updated. It is important to<br />

maintain and update an RBI program to ensure that the most recent<br />

inspection, process, and maintenance information is included. (1) The results<br />

of inspections, (2) changes in process conditions and (3) implementation of<br />

maintenance practices can all have significant effects on risks, and therefore<br />

the inspection plan and can trigger the need to perform a reassessment.<br />

作 为 一 个 动 态 工 具 , 风 险 会 跟 着 时 间 , 操 作 与 缓 解 活 动 的 介 入 而 改 变 , 风 险 也 随<br />

着 这 些 变 化 而 升 减 . 评 估 必 须 最 新 的 检 验 , 工 艺 与 维 护 信 息 , 更 新 反 映 这 些 变 化 .<br />

API 580<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!