Planning Authority<br />

32. The internal subdivision road from cul-de-sac to cul-de-sac is to be of<br />

compacted crushed rock pavement, designed in accordance with the Austroads<br />

Pavement Design Guidelines, with a pavement width of 6.0 metres measured<br />

from lip of kerb to lip of kerb and a minimum total pavement thickness of 350<br />

mm incorporating geotextile reinforcement between the sub-base and subgrade<br />

materials with appropriate geofabric filter plus a 40 mm asphalt seal,<br />

concrete kerb and channel and footpaths all in accordance with the Tasmanian<br />

<strong>Council</strong>s’ Subdivision Standard Drawing SD-1001, and is to be constructed to<br />

the reasonable requirements of the Executive Manager Engineering Services.<br />

33. Road intersections, both internally and within the council road network are to<br />

be assessed in regard to the various requirements of the Austroads Guide to<br />

Traffic Management set. All upgrade and works required to achieve compliance<br />

with the Austroads Guide to Traffic Management set are to be addressed as<br />

part of the road design process.<br />

34. Concrete footpaths of 1.5 metre width in accordance with Tasmanian <strong>Council</strong>s’<br />

Standard Drawing SD-1006 are to be constructed on both sides of the internal<br />

subdivision Road. The footpath is to be located immediately adjacent to lot<br />

boundaries.<br />

35. The developer is to contribute to <strong>Council</strong> funds for the constructions of a 1.5m<br />

wide footpath on the western side of Frederick St, from Belton to Inglis Street.<br />

The contribution amount is to be based on a pro-rata number of approved lots<br />

for the subdivision and the number of existing lots in Belton Street, Stanwyn<br />

Court and the portion of Frederick Street from Lowe Street to Inglis Street.<br />

36. Concrete Barrier Kerb and Channel Type B1 is to be constructed in accordance<br />

with <strong>Council</strong>’s standard drawing SD-1005 on both sides of internal roads.<br />

37. A court bowl of radius 8.5 m and otherwise in accordance with Tasmanian<br />

<strong>Council</strong>s’ Standard Drawing SD-1011 is to be provided at both termination of<br />

the internal road to facilitate the turning movements of vehicles including large<br />

service vehicles such as garbage trucks. Construction is to be of equivalent<br />

standard to the internal road.<br />

38. A temporary court bowl of radius 8.5 m and constructed of minimum 200mm<br />

crushed rock otherwise in accordance with Tasmanian <strong>Council</strong>s’ Standard<br />

Drawing SD-1011 is to be provided at the termination of internal roads<br />

following interim stages to facilitate the turning movements of vehicles<br />

including large service vehicles such as garbage trucks.<br />

<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Minutes Ordinary Meeting – 19 November 2012 – Page 131