11.11.2014 Views

TABLE OF CONTENTS - Waratah-Wynyard Council

TABLE OF CONTENTS - Waratah-Wynyard Council

TABLE OF CONTENTS - Waratah-Wynyard Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Planning Authority<br />

7. The locations of existing private services on the site are to be identified and<br />

where separate private sewer, water and storm water services, including on-site<br />

disposal systems, are required they are to be contained wholly within the<br />

individual lots they serve.<br />

8. The Stennings Road seal and kerb is to be extended to match the extension<br />

required by way of Planning Permit DA0024/2008 and to connect with the<br />

vehicular access to lot 2.<br />

9. A vehicular access with a 40mm asphalt sealed surface is to be constructed<br />

between the edge of the new sealed pavement of Stennings Road and the<br />

property boundary of lot 2, in accordance with the Tasmanian <strong>Council</strong>s’<br />

Subdivision Standard Drawing No SD1009 – Rural Roads – Standard Access and<br />

the conditions in a “Works in Road Reservation Permit”.<br />

10. A vehicular access with a 40mm asphalt sealed surface is to be constructed<br />

between the edge of the sealed pavement of Calder Road to the property<br />

boundary of lot 3, in accordance with the Tasmanian <strong>Council</strong>s’ Subdivision<br />

Standard Drawing No SD1009 and the conditions in a “Works in Road<br />

Reservation Permit”. Note: A sealed swale drain may be constructed in lieu of a<br />

culvert.<br />

11. All new vehicular accesses are to be located in accordance with Tasmanian<br />

<strong>Council</strong>s’ Subdivision Standard Drawing SD – 1012 – Access Sight Distance<br />

Requirements and be approved by the Executive Manager Engineering Services.<br />

12. Underground power is to be provided to each lot in the development in<br />

accordance of the requirements of Aurora Energy and IPWEA standard drawings<br />

and specifications.<br />

13. Telecommunication services are to be provided to each lot in the development<br />

in accordance of the requirements of Telstra and IPWEA standard drawings and<br />

specifications.<br />

14. Control measures are to be installed for the duration of the construction phase<br />

so as to limit the loss of soils and other debris from the site.<br />

15. This development/use is not to result in the generation of environmental harm<br />

or nuisance as defined in the Environmental Management and Pollution Control<br />

Act 1994.<br />

Note:<br />

A “Works within the Road Reservation” permit must be obtained from <strong>Council</strong> for all<br />

activity within the Road Reservation.<br />

<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Minutes Ordinary Meeting – 19 November 2012 – Page 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!