Planning Authority<br />

The application before <strong>Council</strong> is discretionary and is assessed as compliant with the<br />

applicable provisions and standards under the relevant Zone and Schedule Controls. In<br />

particular, this includes Clause 8.4.1, Performance Criteria 7.1 and 7.2 dealing with<br />

wastewater and stormwater management, Clause 8.4.1, Acceptable Solution 10.1 which<br />

requires the developer to cover the costs associated with providing infrastructure<br />

services to the subdivision and the access requirements under Part 14.0 – Road Asset<br />

Schedule.<br />

Whilst the zone provides a minimum lot size of 1,000m 2 , the proposed lots are of an<br />

appropriate size taking account of the servicing constraints and the nature of the existing<br />

and proposed industrial uses and developments.<br />

MOVED BY<br />

SECONDED BY<br />

CR BRAMICH<br />

CR FAIRBROTHER<br />

That the Planning Authority grant approval for a 3 Lot Subdivision – Reliance on<br />

Performance Criteria under Industrial Zone Provisions at 28 Calder Road, <strong>Wynyard</strong><br />

subject to the following conditions:-<br />

PART A CONDITIONS:<br />

1. The development/use, as shown on the endorsed plan(s) and described in the<br />

application, is not to be altered or modified for any reason without the consent<br />

of the Planning Authority.<br />

2. All costs associated with the proposed development including those related to<br />

infrastructure extensions or upgrades to <strong>Council</strong> assets are to be met by the<br />

Developer.<br />

3. A Final Survey Plan submitted for sealing by the <strong>Council</strong> is to show all easements<br />

required for powerlines, sewerage, water, drainage purposes and legal access.<br />

4. Prior to sealing the Final Survey Plan, all works required by this permit are<br />

required to be completed to the satisfaction of <strong>Council</strong>.<br />

5. In the course of undertaking the development/use there is to be no damage<br />

caused to any <strong>Council</strong> owned infrastructure or property.<br />

6. Material or plant may be placed/located on a road, footpath, nature strip or<br />

other <strong>Council</strong>-owned or controlled land only in accordance with the conditions<br />

in a “Works in Road Reservation Permit”.<br />

<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Minutes Ordinary Meeting – 19 November 2012 – Page 35