<strong>Education</strong> <strong>Sector</strong> <strong>Development</strong> <strong>Program</strong> IV<br />

Higher <strong>Education</strong><br />

Enrolment in non government 5% - 15%<br />

institutions<br />

Student/teacher ratio 1:20<br />

(in 2014/15)<br />

Assumptions for cost<br />

All costs are indicated at 2010/11 prices. Unit<br />

costs calculated from available statistics for the<br />

base year (2008/2009) have been updated for<br />

2009/10 and 2010/11 using the same inflation<br />

rate (GDP price index).<br />

Regarding salary costs (teaching and nonteaching<br />

staff), the plan foresees that salaries<br />

remain in line with inflation. Some more detailed<br />

assumptions can be found in Annex 1. Cost<br />

estimates have been added for some specific<br />

programs, including the school feeding program,<br />

scholarships programs, ICT and boarding<br />

facilities. MoFED has also instructed all sector<br />

ministries to include a specific budget for gender<br />

activities; as a result, it has been estimated here<br />

in at 2% of the total sector budget. This share<br />

has therefore been added to the total cost after<br />

all other calculation and is assigned neither to<br />

recurrent nor to capital expenditure nor to federal<br />

or the regional budgets.<br />

The Adult <strong>Education</strong> program foresees to make<br />

95% of illiterate adults participate in a two-year<br />

FAL course. The total number of illiterate adults<br />

is estimated at 36.4 million by 2014/15. It is<br />

therefore planned that 8.65 m will be inducted<br />

each year for the first four years of the program.<br />

Training cost is estimated at $20 per participant<br />

per year, with the government covering 90% of<br />

this cost.<br />

Total ESDP IV cost<br />

The following tables present the overall cost of<br />

ESDP IV, first in aggregate then by sub-sector.<br />

The total cost is estimated at about 140 billion<br />

birr in Table 5.2. The cost increases steadily<br />

between 2010/11 and 2013/14 before decreasing<br />

slightly in the last year. The increasing trend is<br />

mainly due to increasing recurrent costs as the<br />

system expands. The decrease between 2013/14<br />

and 2014/15 is mainly due to a reduction in capital<br />

costs, both at the federal and regional levels.<br />

Table 5.2: Total cost of ESDP IV (in million birr)<br />

2010/11 2011/12 2012/13 2013/14 2014/15 Total<br />

Recurrent<br />

costs<br />

Capital<br />

costs<br />

14,203 19,497 20,272 22,610 23,568 100,150<br />

6,344 8,733 8,366 9,184 7,850 40,477<br />

Total cost 20,547 28,230 28,638 31,794 31,418 140,627<br />

The share of spending per sub-sector and<br />

program during ESDP IV implementation period<br />

is shown in Table 5.3, while Table 5.4 compares<br />

the share of various sub-sectors and programs<br />

between the planned spending for ESDP III and<br />

for ESDP IV.<br />