Education Sector Development Program - VLIR-UOS
Education Sector Development Program - VLIR-UOS
Education Sector Development Program - VLIR-UOS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Education</strong> <strong>Sector</strong> <strong>Development</strong> <strong>Program</strong> IV<br />
Higher <strong>Education</strong><br />
Enrolment in non government 5% - 15%<br />
institutions<br />
Student/teacher ratio 1:20<br />
(in 2014/15)<br />
Assumptions for cost<br />
All costs are indicated at 2010/11 prices. Unit<br />
costs calculated from available statistics for the<br />
base year (2008/2009) have been updated for<br />
2009/10 and 2010/11 using the same inflation<br />
rate (GDP price index).<br />
Regarding salary costs (teaching and nonteaching<br />
staff), the plan foresees that salaries<br />
remain in line with inflation. Some more detailed<br />
assumptions can be found in Annex 1. Cost<br />
estimates have been added for some specific<br />
programs, including the school feeding program,<br />
scholarships programs, ICT and boarding<br />
facilities. MoFED has also instructed all sector<br />
ministries to include a specific budget for gender<br />
activities; as a result, it has been estimated here<br />
in at 2% of the total sector budget. This share<br />
has therefore been added to the total cost after<br />
all other calculation and is assigned neither to<br />
recurrent nor to capital expenditure nor to federal<br />
or the regional budgets.<br />
The Adult <strong>Education</strong> program foresees to make<br />
95% of illiterate adults participate in a two-year<br />
FAL course. The total number of illiterate adults<br />
is estimated at 36.4 million by 2014/15. It is<br />
therefore planned that 8.65 m will be inducted<br />
each year for the first four years of the program.<br />
Training cost is estimated at $20 per participant<br />
per year, with the government covering 90% of<br />
this cost.<br />
Total ESDP IV cost<br />
The following tables present the overall cost of<br />
ESDP IV, first in aggregate then by sub-sector.<br />
The total cost is estimated at about 140 billion<br />
birr in Table 5.2. The cost increases steadily<br />
between 2010/11 and 2013/14 before decreasing<br />
slightly in the last year. The increasing trend is<br />
mainly due to increasing recurrent costs as the<br />
system expands. The decrease between 2013/14<br />
and 2014/15 is mainly due to a reduction in capital<br />
costs, both at the federal and regional levels.<br />
Table 5.2: Total cost of ESDP IV (in million birr)<br />
2010/11 2011/12 2012/13 2013/14 2014/15 Total<br />
Recurrent<br />
costs<br />
Capital<br />
costs<br />
14,203 19,497 20,272 22,610 23,568 100,150<br />
6,344 8,733 8,366 9,184 7,850 40,477<br />
Total cost 20,547 28,230 28,638 31,794 31,418 140,627<br />
The share of spending per sub-sector and<br />
program during ESDP IV implementation period<br />
is shown in Table 5.3, while Table 5.4 compares<br />
the share of various sub-sectors and programs<br />
between the planned spending for ESDP III and<br />
for ESDP IV.<br />
100