tween this bridge and a re<strong>in</strong>forced concrete bridge with expansion jo<strong>in</strong>ts. The comparison is<br />

made <strong>in</strong> terms of the overall life cycle costs by perform<strong>in</strong>g the life cycle cost analysis (LCCA)<br />

and also the environmental performance by mak<strong>in</strong>g a life cycle assessment (LCA) study of both<br />

solutions.<br />

2 THE CASE STUDY<br />

The object of the study is a bridge built over the river Leduån <strong>in</strong> northern Sweden. This is an<br />

<strong>in</strong>tegral abutment bridge with a s<strong>in</strong>gle 40 meters span. The purpose of the study was to make a<br />

comparative life cycle analysis of this bridge with a two span re<strong>in</strong>forced concrete bridge. The<br />

length of each span of the concrete bridge is 18 meters with a middle pier <strong>in</strong> the river and end<br />

screens at the supports. Both bridges have a 5 meters wide cross section.<br />

The <strong>in</strong>tegral bridge was part of an <strong>in</strong>ternational research project commissioned to study the<br />

<strong>in</strong>tegral abutment bridges with respect to their efficiency <strong>in</strong> terms of design and economy. It<br />

was therefore equipped with several measurement devices and was monitored for about 18<br />

months to determ<strong>in</strong>e the impact of seasonal variations on its behavior.<br />

The design service life of both the bridges was 120 years. The ma<strong>in</strong> contributors to the<br />

project are as follows:<br />

Rhe<strong>in</strong>isch Westfälische Technische Hochschule Aachen (RWTH);<br />

Luleå University of Technology (LTU);<br />

Ramböll Sweden;<br />

University of Liege (ULg);<br />

Arcelor Profil Luxembourg S.A.<br />

2.1 Integral abutment bridge<br />

The design of this bridge was performed by Ramböll office <strong>in</strong> Luleå, Sweden. The total span<br />

length of the bridge is 40 meters. The superstructure consists of two I-beam girders support<strong>in</strong>g<br />

a concrete deck mak<strong>in</strong>g up a steel-concrete composite cross section. The abutments are supported<br />

by 6 circular steel end bear<strong>in</strong>g piles driven <strong>in</strong>to the support<strong>in</strong>g ground. The end screens<br />

of the abutments are cast around the piles, which therefore makes it an <strong>in</strong>tegral abutment.<br />

Table 1 <strong>in</strong>dicates the bill of material for this bridge.<br />

Table 1: Bill of materials of the Leduån IA bridge<br />

Material Quantity Unit<br />

Concrete Grade C40/50 108.5 m3<br />

Re<strong>in</strong>forcemnt Grade B500 6.3 ton<br />

Steel Grade S355 (web) & S460 (flanges) 41.4 ton<br />

Steel piles (φ170x10) Grade S440 13.9 ton<br />

Steel pipes (φ600x1.6) Grade S355 0.6 ton<br />

Steel studs (φ22) 1000.0 Unit<br />

Pa<strong>in</strong>t (Epoxy and Polyurethane) 3000.0 m2<br />

Polystyrene 1.5 m2<br />

The constructor provided all the detailed <strong>in</strong>formation regard<strong>in</strong>g the transportation of these<br />

materials to the construction site. This data was required for mak<strong>in</strong>g the environmental impact<br />

assessment study of the bridge construction. The ma<strong>in</strong> steel elements such as girders, brac<strong>in</strong>gs<br />

and the steel piles were transported from F<strong>in</strong>land by truck cover<strong>in</strong>g 700 km distance to the construction<br />

site. Local concrete factory provided the concrete and a local distributor supplied the<br />

re<strong>in</strong>forcements.<br />