7. Proposed Park and Ride Facilities RTC SR-160 <strong>Corridor</strong> <strong>Study</strong><br />
7.3.3 SR-160 between Rainbow and Torrey Pines<br />
Reference No.: 1-4<br />
Size:<br />
~65 acres (total)<br />
Owner:<br />
USA / BLM<br />
Parcel Numbers: 176-23-601-017 (pt N2 sec 23 22 60)<br />
176-23-201-003 (pt S2 N2 sec 23 22 60)<br />
EXHIBIT 7-15: Park & Ride Site 1-4<br />
Park-&-Ride<br />
This Park & Ride facility, located 2.5 miles east of Site 1-2/2-2, would initially occupy<br />
approximately 15.8 acres of land between Redwood Street and S. Torrey Pines Drive, which<br />
is located at the southwest corner of the 57.11 acre Clark County parcel 176-23-601-017.<br />
Should additional parking eventually be required, an additional 4.5 acres is available east of<br />
Torrey Pines in the same parcel, with another 4+ acres east of Torrey Pines in parcel<br />
176-23-201-003 northeast of the original site.<br />
The southwest corner of the facility would be located at the corner of Redwood Street and<br />
W. Serene Avenue. W. Serene Avenue provides access to S. Rainbow Boulevard, which<br />
connects to SR-160 at a signaled intersection. The east end of the facility would connect to<br />
SR-160 via S. Torrey Pines Drive at a signaled intersection 13 .<br />
At this time, the parcel is flat and is completely undeveloped. However, RTC is working with<br />
the Clark County Redevelopment Agency to develop workforce housing and shared parking<br />
facilities adjacent to the currently proposed school site. The current condition of the portion<br />
that is to be used for the Park & Ride is shown in EXHIBIT 7-16 and EXHIBIT 7-17 below,<br />
13 Although the SR-160 / Torrey Pines intersection is not currently programmed to be signaled, NDOT expects it to<br />
qualify prior to the completion of highway improvements.<br />
7-15