(Blue Diamond Road) Corridor Study - Regional Transportation ...
(Blue Diamond Road) Corridor Study - Regional Transportation ...
(Blue Diamond Road) Corridor Study - Regional Transportation ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8. Estimated System Costs RTC SR-160 <strong>Corridor</strong> <strong>Study</strong><br />
2015<br />
Alternative 1 (2015) reflects the level of transit investment in the SR-160 corridor by 2015<br />
and includes all services shown in Exhibit 5-11 except the second local route (designated in<br />
orange) connecting to CAT routes 201 and 203 at Flamingo and Durango Boulevards.<br />
2025<br />
Alternative 1 (2025) reflects the maximum level of transit investment in the SR-160 corridor<br />
and includes all elements shown in Exhibit 5-12 – two local routes, an express route and<br />
BRT service on SR-160 connecting to the region’s future fixed guideway system on South<br />
Las Vegas Boulevard.<br />
Operating costs for each of the three time horizons for Alternative 1 are summarized in<br />
EXHIBIT 8-6, and are shown in current year (2006) dollars.<br />
Routes<br />
Local Route 1<br />
(Route 101 Connector)<br />
Local Route 2<br />
(Route 201 and 203<br />
Connector)<br />
Express Route 1<br />
(on BRT alignment)<br />
Express Route 1a<br />
(Route 103 Connector)<br />
BRT Route<br />
(connecting to southern<br />
end of <strong>Regional</strong> Fixed<br />
Guideway on S. Las<br />
Vegas Boulevard)<br />
EXHIBIT 8-6: Alternative 1 – Operating Costs<br />
Route<br />
Length<br />
(miles)<br />
Peak<br />
Frequency<br />
(minutes)<br />
Annual<br />
Service<br />
Hours<br />
Alternative 1<br />
– 2008<br />
(’06 millions $)<br />
Alternative 1<br />
– 2015<br />
(’06 millions $)<br />
Alternative 1<br />
– 2025<br />
(’06 millions $)<br />
8.84 30 20,877 $1.16 $1.16 $1.16<br />
11.38 20 40,313 -- -- $2.25<br />
10.48 15 38,076 $2.12 -- --<br />
10.99 30 19,965 -- $1.11 $1.11<br />
10.48 15 30,937 -- $2.57 $2.57<br />
TOTAL -- -- -- $3.28 $4.84 $7.09<br />
Annual service hours for each route alternative are a direct reflection of the route length,<br />
peak service frequency, and operating speed of each route. Generally, greater service<br />
frequencies, longer route lengths, and lower operating speeds lead to greater service hours<br />
resulting in overall higher service hours for local routes than either express or BRT routes.<br />
On a cost basis, however, BRT is the most expensive service to operate due to the higher<br />
cost per hour.<br />
8-9