8. Estimated System Costs RTC SR-160 <strong>Corridor</strong> <strong>Study</strong><br />

System Elements<br />

Alternative 2 –<br />

2008<br />

(’06 $)<br />

Alternative 2 –<br />

2015<br />

(’06 $)<br />

Alternative 2 –<br />

2025<br />

(’06 $)<br />

Ticket Vending Machines -- -- $560,000<br />

Operations Control -- -- $250,000<br />

Subtotal: Other Costs -- -- $860,000<br />

Cost Contingencies<br />

Program Implementation<br />

Guideway Costs (10%) -- -- $50,000<br />

Design/Construction (25%) -- -- $2,995,000<br />

Vehicle Costs (10%) $0 - $350,000 $0 - $595,000<br />

Subtotal: Cost Contingencies $0 - $350,000 $0 - $595,000<br />

$1,048,000 -<br />

$1,468,000<br />

$4,093,000 -<br />

$4,513,000<br />

Design/Construction (31%) -- -- $3,713,000<br />

Guideway (15%) -- -- $75,000<br />

Vehicle Procurement (5%) $0 -$262,500 $0 - $297,500 $524,000 - $734,000<br />

Project Reserve (10%)<br />

Subtotal: Program Implementation $800 – $648,300<br />

TOTAL<br />

$800 - $385,800 $2,600 - $657,100<br />

$8,800 -<br />

$4,506,300<br />

$2,600 -<br />

$954,600<br />

$28,600 -<br />

$7,525,600<br />

$2,791,000 -<br />

$6,114,200<br />

$7,103,000 -<br />

$10,636,200<br />

$35,013,000 -<br />

$71,778,200<br />

Alternatives 2 (2008) and (2015), which vary only by the level of conventional bus transit<br />

provided, have much lower capital costs than Alternative 2 (2025) which introduces BRT. If<br />

no additional buses are required, capital costs for Alternatives 2 (2008) and (2015) would<br />

be incurred only for bus stop amenities – benches, shelters, and signage. Alternative 2<br />

(2025) is very close in cost to Alternatives 1 (2015) and 1 (2025) as all three include BRT<br />

(the largest capital cost element of the alternatives under review), and vary only by the<br />

level of conventional bus transit to be provided. Indeed, were there no need for additional<br />

40 foot coaches, capital costs for Alternative 1 (2008) and (2025), and Alternative 2 (2025)<br />

would be virtually identical.<br />

8.1.4 Summary/Conclusions<br />

Differences in capital cost estimates for Alternatives 1 and 2 arise primarily from the year in<br />

which BRT service is provided in the corridor (2015 versus 2025), and the level of<br />

conventional bus transit service provided and the resulting need (or lack thereof) of<br />

additional 40’ vehicles for the bus service.<br />

On a year-by-year basis, Alternative 2 is the lower capital cost alternative as it provides an<br />

overall lower level of transit investment. Overall, BRT costs on a per mile basis are<br />

estimated to be between $3.34 million and $6.37 million depending on the need to purchase<br />

land from BLM for Park & Ride facilities.<br />