29.12.2014 Views

(Blue Diamond Road) Corridor Study - Regional Transportation ...

(Blue Diamond Road) Corridor Study - Regional Transportation ...

(Blue Diamond Road) Corridor Study - Regional Transportation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. Alternative Development RTC SR-160 <strong>Corridor</strong> <strong>Study</strong><br />

5.0 ALTERNATIVE DEVELOPMENT<br />

The development of transit alternatives along SR-160 has been an iterative process<br />

throughout the project. In the second phase of the work, the consultant assessed proposed<br />

alternatives both through the planning framework summarized above, as well as the<br />

screening methodology for best modal treatment. Stakeholder input influenced the process<br />

on a regular basis through bi-monthly Technical Working Group meetings.<br />

This section summarizes the development of multi-modal alternatives for SR-160. First the<br />

potential alignments are presented. Second, the mode screening methodology is presented.<br />

Finally, the section presents the preferred modal options for each corridor (i.e., radial and<br />

cross-town corridor), within the <strong>Blue</strong> <strong>Diamond</strong> <strong>Study</strong> Area.<br />

5.1 RADIAL AND CROSS TOWN ALIGNMENTS<br />

The consultant presented a series of Alternative proposals to the Technical Working Group<br />

in October 2005 and again in March 2006. Each proposal was subject to considerable<br />

debate, and gradually fine-tuned with respect to alignment, modal treatment, and<br />

applicability of Park & Ride locations.<br />

Exhibit 5-1 presents a summary of sketch planning variables used to assess the suitability<br />

of potential corridors for transit investment. Building on the analysis performed in the prior<br />

section, this section presents both qualitative and quantitative data related to the variables<br />

discussed above.<br />

Alignments<br />

EXHIBIT 5-1: Summary Assessment of Potential Alignments<br />

Radial Alignments<br />

Existing<br />

Transit<br />

Estimated<br />

2030 Daily<br />

Traffic<br />

Volumes<br />

Extra Rightof-Way<br />

Available<br />

Pedestrian<br />

Accessibility<br />

1. Durango Drive None 12,893 Yes 0<br />

2. Rainbow Boulevard None 15,253 Yes 2<br />

3. UPRR ROW None -- Yes 0<br />

4. Decatur Boulevard None 28,729 Yes 2<br />

5. Las Vegas Boulevard South None 17,912 Yes 2<br />

Cross-Town Alignments<br />

1. Warm Springs <strong>Road</strong> None 11,958 No 0<br />

2. SR-160 None 37,044 No 0<br />

3. Silverado Ranch <strong>Road</strong> None 17,389 Yes 0<br />

4 = Excellent 2 = Limited 0 = Poor<br />

5-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!