29.12.2014 Views

(Blue Diamond Road) Corridor Study - Regional Transportation ...

(Blue Diamond Road) Corridor Study - Regional Transportation ...

(Blue Diamond Road) Corridor Study - Regional Transportation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. <strong>Study</strong> Area <strong>Transportation</strong> System RTC SR-160 <strong>Corridor</strong> <strong>Study</strong><br />

EXHIBIT 5-15: Alternative 2 – Moderate Growth (2025)<br />

Alternative 2 – Moderate Growth<br />

(2025) involves the conversion of the<br />

express route along SR-160 to a bus rapid<br />

transit route. The BRT overlay route is<br />

designed to offer enhanced end-to-end<br />

travel times between the western terminal<br />

PR 1-1 through numerous operational<br />

enhancements and service attributes,<br />

including fewer station stops, enhanced<br />

stations (with multi-entry level<br />

boardings), dedicated bus lanes along SR-<br />

160, traffic signal priority (TSP) and/or<br />

queue-jumping. This route will also have a<br />

dedicated fleet of advanced BRT vehicles<br />

similar in design and station interface as<br />

the MAX system, with an off-vehicle proofof-payment<br />

fare system.<br />

The final buildout is also adds an express<br />

route service from PR 1-1 along SR-160,<br />

with service along Decatur Boulevard.<br />

Both the Decatur Express and <strong>Blue</strong><br />

<strong>Diamond</strong> BRT would operate along a<br />

dedicated busway on SR-160. This<br />

buildout scenario is designed to provide<br />

northern connections via three primary<br />

axes: Durango Drive, Decatur Blvd and<br />

Las Vegas Boulevard.<br />

5-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!