29.12.2014 Views

(Blue Diamond Road) Corridor Study - Regional Transportation ...

(Blue Diamond Road) Corridor Study - Regional Transportation ...

(Blue Diamond Road) Corridor Study - Regional Transportation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Alternative Development RTC SR-160 <strong>Corridor</strong> <strong>Study</strong><br />

EXHIBIT 5-13: Alternative 2 – High Growth (2008)<br />

Alternative 2 – Moderate Growth<br />

(2008) is the first of a phased transit<br />

investment strategy that expands service<br />

more conservatively based on lower<br />

transit demand and lower overall<br />

development growth than assumed in<br />

Alternative 1. The most obvious<br />

difference between this investment<br />

strategy and Phases 1 (A, B and C) is that<br />

Phase 2 is scaled up in more<br />

conservatively, with the Phase 2 (2025)<br />

representing a more modest buildout than<br />

Alternative 1. These alternatives are<br />

meant to reflect a scenario in which<br />

corridor ridership is moderate.<br />

Alternative 2 – Moderate Growth (2008) is<br />

composed of one express trunk route<br />

anchored to the planned Park & Ride lot at<br />

SR-160 and Hualapai Way. The express<br />

route along SR-160 (shown in green)<br />

provides service to both Park & Ride lots<br />

along SR-160, extends north on Las Vegas<br />

Boulevard South, east on Warm Springs<br />

<strong>Road</strong>, then north on Gilespie to the South<br />

Strip Transfer Terminal (SSTT). The<br />

express route is designed to connect<br />

western <strong>Blue</strong> <strong>Diamond</strong> area to routes<br />

serving the Las Vegas Strip and retail and<br />

employment areas north via SSTT.<br />

Park & Ride Sites 1-1 and 1-4 are critical<br />

features to the transit plan for the <strong>Blue</strong><br />

<strong>Diamond</strong> corridor. PR 1-1 is designed to<br />

attract commuters from the Pahrump<br />

Valley, Mountain’s Edge and Rhodes<br />

Ranch; PR 1-4 is designed to attract<br />

commuters from Pinnacle Peaks, Southern<br />

Highlands and other communities near<br />

central SR-160.<br />

5-18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!