01.01.2015 Views

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Systems and Equipment - 118<br />

JT5 Operator’s <strong>Manual</strong><br />

Drill Pipe<br />

Use Caps and Plugs<br />

Before transporting in dusty conditions or prolonged<br />

storage, install caps and plugs to male and female<br />

ends of pipe and to saver sub.<br />

Replace Worn Saver Sub<br />

Because each pipe comes in contact with the saver sub, check saver sub regularly for wear. Replace it<br />

when it is worn, or it will damage your drill pipe. See page 149 for replacement procedure.<br />

Precondition a new saver sub the same way you do new pipe. See “Precondition New Pipe” on page 117.<br />

Rotate Pipe Order<br />

Because the lead drill pipe is in the ground longer, it is subjected to higher shock loads and experiences<br />

more wear. To help spread this wear evenly over all pipe, move the lead pipe from the previous job out of<br />

the first position. See “Rotate Pipe Order” on page 118.<br />

CMW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!