01.01.2015 Views

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Transport - 70<br />

Unload<br />

JT5 Operator’s <strong>Manual</strong><br />

Haul<br />

Crushing weight. If load falls or moves it could kill or crush you. Use<br />

proper procedures and equipment or stay away.<br />

NOTICE:<br />

• Load and unload trailer on level ground.<br />

• Ensure trailer wheels are blocked.<br />

• Attach trailer to vehicle before loading or unloading.<br />

1. Lower ramps.<br />

2. Remove tiedowns.<br />

3. Start drilling unit engine.<br />

4. Raise stabilizer and drill frame.<br />

5. Slow engine to low throttle and slowly back unit down trailer or ramps.<br />

CMW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!