01.01.2015 Views

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Conduct a Bore - 80<br />

Attach Transition Sub<br />

JT5 Operator’s <strong>Manual</strong><br />

Assemble Drill String<br />

Use either machine torque or quick wrench to<br />

attach transition sub.<br />

• Attach transition sub (6) directly to beacon<br />

housing (1), or<br />

• Attach transition sub (5) to EZ-Connect<br />

adaptor (4).<br />

Machine Torque<br />

1. Apply tool joint compound to shoulders and<br />

threads and thread transition sub onto saver<br />

sub.<br />

2. Align drill pipe flats of EZ-Connect box or<br />

beacon housing with front wrench of drill<br />

frame.<br />

3. Start drilling unit engine.<br />

4. Use machine power to slowly rotate spindle and transition sub onto EZ-Connect box or beacon<br />

housing.<br />

5. Tighten to full machine torque.<br />

Quick Wrench<br />

1. Lube joints with TJC.<br />

2. Attach quick wrench to the joint in the join position and tighten joint. See “Quick Wrench” on page 115.<br />

Connect Drill Pipe<br />

1. Start drilling unit engine.<br />

2. Align transition sub in front wrench.<br />

3. Load pipe into wrench cradle.<br />

4. Lubricate shoulders and threads.<br />

5. Remove hands from pipe area.<br />

6. Move carriage forward until saver sub nears male pipe thread.<br />

7. Slowly rotate spindle clockwise. Carriage will move forward as threads screw together.<br />

8. Slowly move carriage forward until pipe end touches end of transition sub.<br />

9. To thread pipes together and fully torque joint, slowly rotate drill pipe until spindle stops turning.<br />

10. Open front wrench and move carriage back.<br />

CMW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!