01.01.2015 Views

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Controls - 36<br />

JT5 Operator’s <strong>Manual</strong><br />

ESID<br />

Item Description Notes<br />

6. OK indicator Green light means system<br />

self test detected no<br />

problems.<br />

Strike system is ready to<br />

operate.<br />

7. Electrical power supply<br />

indicator<br />

Green light means control<br />

box has sufficient electrical<br />

power for operation.<br />

Strike system is ready to<br />

operate if OK indicator is also<br />

on.<br />

8. Self test button To start manual self test,<br />

press.<br />

To reset system after a strike<br />

has been detected, press.<br />

Checks all systems and circuits.<br />

NOTICE: See “If an Electric Line is<br />

Damaged” on page 18.<br />

CMW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!