01.01.2015 Views

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

JT5 Operator’s <strong>Manual</strong> Conduct a Bore - 79<br />

Assemble Drill String<br />

Assemble Drill String<br />

Moving tools will kill or injure. Shut off drill string power when anyone can<br />

be struck by moving or thrown tools. Never use pipe wrenches on drill string.<br />

Prepare Beacon Housing<br />

1. Select nozzles and bit.<br />

IMPORTANT: A variety of nozzles and bits are available to suit your particular job conditions. See<br />

“Downhole Tools” on page 110 for more information, or contact your <strong>Ditch</strong> <strong>Witch</strong> dealer.<br />

2. Insert nozzle (2) into beacon housing.<br />

3. Attach bit (3) to beacon housing (1).<br />

4. Install beacon, following beacon instructions<br />

for:<br />

• battery replacement<br />

• beacon positioning<br />

5. Install beacon housing lid. See “Beacon<br />

Housings” on page 111.<br />

6. Follow beacon instructions to check beacon<br />

operation.<br />

7. Follow tracker instructions to calibrate<br />

beacon.<br />

Attach EZ-Connect to Drill Head<br />

1. Apply tool joint compound to shoulders and threads and hand tighten EZ-Connect adapter (4) to<br />

beacon housing (1).<br />

2. Use quick wrench to fully tighten joint.<br />

CMW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!