You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Transport - 68<br />
Lift<br />
JT5 Operator’s <strong>Manual</strong><br />
Lift<br />
This machine is not configured for lifting. If the machine must be lifted, load machine into a container or<br />
onto a platform appropriate for lifting. See “Specifications” on page 151 for weight of machine.<br />
Haul<br />
Load<br />
Crushing weight. If load falls or moves it could kill or crush you. Use<br />
proper procedures and equipment or stay away.<br />
NOTICE:<br />
• Load and unload trailer on level ground.<br />
• Verify that trailer wheels are blocked.<br />
• Incorrect loading can cause trailer swaying.<br />
• Attach trailer to vehicle before loading or unloading.<br />
• Ten to fifteen percent of total vehicle weight (equipment plus trailer) must be on tongue to help<br />
prevent trailer sway.<br />
1. Start drilling unit engine.<br />
2. Move drilling unit to rear of trailer and align with ramps.<br />
3. Slow engine to low throttle and slowly drive unit onto trailer.<br />
4. Lower drill frame and stabilizer to trailer floor. Keep tracks fully on trailer floor.<br />
5. Stop engine when unit is safely positioned on trailer bed.<br />
6. Attach tiedowns to drilling unit where indicated on page 69.<br />
CMW