01.01.2015 Views

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Operation Overview - 44<br />

Planning<br />

JT5 Operator’s <strong>Manual</strong><br />

Planning<br />

1. Gather information about jobsite. See page 49.<br />

2. Inspect jobsite. See page 50.<br />

3. Classify jobsite. See page 52.<br />

4. Plan bore path. See page 55.<br />

5. Check supplies and prepare equipment. See page 61.<br />

6. Load equipment. Seepage 68.<br />

Setting Up at Jobsite<br />

1. Prepare jobsite. See page 60.<br />

2. Unload drilling unit from trailer. See page 70.<br />

3. Assemble drill string. See page 79.<br />

4. Position drilling unit and frame. See page 75.<br />

5. Assemble strike system. See page 95.<br />

6. Anchor drilling unit. See page 93.<br />

7. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.<br />

CMW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!