Operation Overview - 44<br />
Planning<br />
JT5 Operator’s <strong>Manual</strong><br />
Planning<br />
1. Gather information about jobsite. See page 49.<br />
2. Inspect jobsite. See page 50.<br />
3. Classify jobsite. See page 52.<br />
4. Plan bore path. See page 55.<br />
5. Check supplies and prepare equipment. See page 61.<br />
6. Load equipment. Seepage 68.<br />
Setting Up at Jobsite<br />
1. Prepare jobsite. See page 60.<br />
2. Unload drilling unit from trailer. See page 70.<br />
3. Assemble drill string. See page 79.<br />
4. Position drilling unit and frame. See page 75.<br />
5. Assemble strike system. See page 95.<br />
6. Anchor drilling unit. See page 93.<br />
7. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.<br />