01.01.2015 Views

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Conduct a Bore - 82<br />

Add Pipe<br />

JT5 Operator’s <strong>Manual</strong><br />

Add Pipe<br />

1. Set engine throttle to full speed.<br />

2. Clamp pipe joint. See “Clamp Pipe” on page 78.<br />

3. Locate drill head.<br />

4. Engage front wrench until pipe is clamped and pressure develops.<br />

5. Slowly rotate spindle counterclockwise. Move carriage back as threads unscrew.<br />

6. After threads are fully unscrewed, stop rotation and move carriage to back of frame, slowing down as<br />

carriage approaches rear end.<br />

7. Connect Pipe. See “Connect Drill Pipe” on page 80.<br />

8. Ensure that pipe fills and fluid pressure begins to rise.<br />

9. Rotate spindle.<br />

10. Slowly move carriage forward. Adjust rotation speed control according to bit size and soil conditions.<br />

11. Monitor gauges.<br />

12. Locate drill head with tracker at least every half-length of pipe.<br />

CMW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!