Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...
Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...
Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />
2.2.2 Review and Improvement<br />
Any user of this document who encounters a mistake or confusing entry is requested to<br />
immediately notify the Document Custodian. Any vessel may pass such issues to SEIC<br />
via the Loading Master at the terminal.<br />
This document shall be reviewed as necessary by the Document Custodian at SEIC, but<br />
at least once every 3 years. Triggers for full or partial review may include:<br />
• Emerging/growing HSE concerns in specific areas.<br />
• Incident investigations which identify shortfalls in this procedure.<br />
• Changing Company activities and locations.<br />
• New hazards or activities not considered in this procedure.<br />
• Introduction of new legislation or rules and regulations.<br />
3 Responsibilities<br />
3.1 SEIC Logistics Manager<br />
The SEIC Logistics Manager is accountable for all logistics activities conducted with Sakhalin<br />
Energy including contracted marine services.<br />
3.2 SEIC Marine Manager<br />
The SEIC Marine Manager is responsible for the management of all marine activities on behalf<br />
of the Company, and for monitoring compliance with these procedures. He is also responsible<br />
for encouraging compliance by liaison visits to the Tanker Loading Unit and LNG terminal<br />
facilities, service providers, SEIC contractors, operators and vessels. He will arrange for liaison<br />
visits and audits to ensure compliance with Shell Group standards.<br />
For visiting vessels the point of contact will be via the Loading Master or the terminal<br />
communications address.<br />
4 References<br />
Other applicable documents which should be read or referenced in conjunction with this document<br />
include:<br />
Corporate Document Control Procedure<br />
0000-S-90-01-P-0078-00-E<br />
0000-S-90-01-P-0207-00-E<br />
Page 10 of 101<br />
BM Code: EP.14.03.01.09