<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />
20 TLU Hose Connection<br />
The hose connection is made once the mooring is completed. Connection operations will only be<br />
performed under the direction of the Loading Master in compliance with strict SEIC safety criteria<br />
and in accordance with OCIMF recommendations.<br />
20.1 Summer<br />
The workboat will tow the end of the floating hose towards the portside manifold of the tanker.<br />
The tanker will have prepared the manifold to make the connection, including making ready the<br />
crane or derrick.<br />
The hook will be lowered to the water line and the work boat will then attach the lifting chain on<br />
the end of the hose onto the hook, and end of the hose will be lifted clear of the water and to a<br />
height such that the ‘snubbing’ chain can be attached to the deck securing chain. Judgement<br />
will be required to obtain the correct position for the attachment, in order that when the crane<br />
0000-S-90-01-P-0207-00-E<br />
Page 42 of 101<br />
BM Code: EP.14.03.01.09