<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />

20 TLU Hose Connection<br />

The hose connection is made once the mooring is completed. Connection operations will only be<br />

performed under the direction of the Loading Master in compliance with strict SEIC safety criteria<br />

and in accordance with OCIMF recommendations.<br />

20.1 Summer<br />

The workboat will tow the end of the floating hose towards the portside manifold of the tanker.<br />

The tanker will have prepared the manifold to make the connection, including making ready the<br />

crane or derrick.<br />

The hook will be lowered to the water line and the work boat will then attach the lifting chain on<br />

the end of the hose onto the hook, and end of the hose will be lifted clear of the water and to a<br />

height such that the ‘snubbing’ chain can be attached to the deck securing chain. Judgement<br />

will be required to obtain the correct position for the attachment, in order that when the crane<br />

0000-S-90-01-P-0207-00-E<br />

Page 42 of 101<br />

BM Code: EP.14.03.01.09