<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />
connection<br />
Have measures been taken to<br />
ensure sufficient pump room<br />
ventilation<br />
If the ship is capable of closed<br />
loading, have requirements for<br />
closed operations been agreed<br />
Has an adequate vapour return line<br />
been connected<br />
If a vapour return line is<br />
connected, have operating<br />
parameters been agreed<br />
Are ship emergency fire control<br />
plans located externally<br />
R<br />
R<br />
If the ship is fitted or is required to be fitted with an Inert gas System the following questions<br />
should be answered.<br />
Inert Gas System Ship <strong>Terminal</strong> Code Remarks<br />
Is the Inert gas System fully<br />
operational and in good working<br />
P<br />
order<br />
Are deck seals in good working<br />
order<br />
R<br />
Are liquid levels in p/v breakers<br />
correct<br />
R<br />
Have fixed and portable oxygen<br />
analysers been calibrated and are<br />
R<br />
working properly<br />
Are fixed IG pressure and oxygen<br />
recorders working<br />
R<br />
Are all cargo tank atmospheres 8%<br />
or less oxygen content by volume<br />
PR<br />
and with positive pressure<br />
Are all individual tank IG valves (if<br />
fitted) correctly set and locked<br />
R<br />
Are all the persons in charge of<br />
cargo operations aware that in the<br />
case of failure of the Inert Gas<br />
Plant, discharge operations should<br />
cease and the terminal so<br />
advised<br />
0000-S-90-01-P-0207-00-E<br />
Page 88 of 101<br />
BM Code: EP.14.03.01.09