<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />
Any deviation to the pre arrival advice must be relayed directly to the LNG terminal.<br />
One hour prior to ship berthing the terminal will advise the LNG storage and the loading panel<br />
man who will then advise his operational team for loading readiness.<br />
Once the ship is berthed, all Loading Master communications will be directed to either the<br />
LNG jetty loading senior operations technicians (SOT’s) or the LNG storage and loading panel<br />
operator as required to accommodate ESD checks/arm connections/cooldown/arm<br />
disconnections (as per LNG operational loading procedures).<br />
All communications will be relayed via the LNG terminal operational radio system when the<br />
ship has been berthed. All prior communications to berthing are via the marine VHF system.<br />
On commencement of loading and for the duration of loading hourly transmissions from the<br />
ship will advise the terminal LNG panel operator of loading conditions, rates and quantities.<br />
On completion of unmooring activities the marine terminal will advise the LNG storage and<br />
loading panel man and vacation of berth.<br />
One hour prior to ship berthing the terminal will advise the OET storage and loading panel<br />
man who will then advice his operational team for loading readiness.<br />
Note:- Shore tankage pre-checks, e.g. dewatering, gauging / certification will be confirmed as<br />
completed by the OET panelman.<br />
Once the ship is berthed all communications will be directed to the OET storage and loading<br />
panel operator as required to accommodate all shore loading activities. (As per OET<br />
operational loading procedures).<br />
Note:- No operation technicians will be present on the TLU during any phase of the shipping /<br />
loading operation.<br />
All communications will be relayed via the LNG/OET terminal operational radio system.<br />
During “start up” and “topping off” phases of the cargo loading operation the Loading Master<br />
will be present in the ship’s Cargo Control Room (CCR) to monitor operations and assist in<br />
communications where necessary.<br />
Throughout the loading process the Responsible Ship’s Officer, or designated ship’s duty<br />
officer, shall keep <strong>Prigorodnoye</strong> Control Room advised of any circumstances, which may have<br />
an impact on the loading or safety of the ship.<br />
All communications between ship and shore should be conducted in English and a ‘positive’<br />
reporting system used, i.e. all messages should be repeated back by the recipient and<br />
acknowledged by the sender.<br />
Ship/shore communications will be effected primarily by ship/shore telephone through the fibre<br />
optic communications link or by back up ship/shore VHF radio, either walkie-talkie or ship’s<br />
fixed VHF unit by agreement with the Loading Master/Pilot/Ice Pilot.<br />
31.3.1 LNG Communications<br />
0000-S-90-01-P-0207-00-E<br />
Page 60 of 101<br />
BM Code: EP.14.03.01.09