21.01.2015 Views

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />

Appendix 6 - Conditions of Use (COU).<br />

Sakhalin Energy Investment Company Ltd.<br />

All facilities and assistance of any kind whatsoever provided by Sakhalin Energy Investment<br />

Company Ltd. and/or (hereinafter collectively and severally referred to as ‘Company’ which<br />

term shall be deemed to include their respective servants, agents and contractors including<br />

production sharing contractors and their affiliates in whatever capacity they may be acting) to<br />

vessels calling at the <strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> (including its anchorage and approaches<br />

associated therewith and the liquefaction plant, storage areas, terminals or facilities therein,<br />

collectively hereinafter called “the <strong>Terminal</strong>”) whether charged for or not by the Company, are<br />

provided subject to the following Conditions (whether or not a copy of the same has been<br />

signed):<br />

All LNG Carriers nominated for this <strong>Terminal</strong> must be capable of operating within the physical<br />

limitations of the <strong>Terminal</strong>’s berth dimensions, loading arm envelopes and mooring equipment<br />

as detailed in the <strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> or as advised by the<br />

<strong>Terminal</strong> from time to time.<br />

All Crude Oil tankers nominated for this <strong>Terminal</strong> must be capable of operating within the<br />

physical limitations of the Tanker Loading Unit (TLU), Loading hose arrangement and mooring<br />

equipment as detailed in the <strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> or as advised by<br />

the <strong>Terminal</strong> from time to time.<br />

All Tankers nominated at this port during the ‘Ice Period’ must comply with the terminal<br />

Requirements for vessels loading at that time of year as detailed in the <strong>Prigorodnoye</strong> <strong>Export</strong><br />

<strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> or as advised from time to time.<br />

In addition to any other conditions which may be prescribed by regulation, law or enactment,<br />

any and all facilities and assistance of any sort whatsoever provided by the Company in<br />

connection with the <strong>Terminal</strong> and <strong>Terminal</strong> facilities whether or not any charge is made by the<br />

Company therefore, are provided subject to the following conditions:<br />

The Master of any vessel shall in all circumstances remain solely responsible on behalf of his<br />

owners for the safety and proper navigation of his vessel, and shall comply with the<br />

<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> at all times.<br />

All vessels berthing at <strong>Prigorodnoye</strong> must use the <strong>Terminal</strong>’s tugs operated by SEIC.<br />

Towage is provided under the “UK Terms & Conditions for Towage and Other Services<br />

(Revised 1986)”, a copy of which is attached to the end of <strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong><br />

<strong>Regulations</strong> in Appendix 3.<br />

Subject to the provisions of any applicable Ship-Shore Liability Agreement for LNG carriers<br />

entered into by the Parties:<br />

(a)<br />

(b)<br />

Neither Company nor its servants, agents or contractors (in whatsoever capacity they<br />

may be acting) shall be responsible for any loss, damage or delay arising from the use<br />

of the <strong>Port</strong> or its berths by any Vessel including but not limited to any assistance,<br />

advice or instructions given or tendered in respect of any Vessel, whether by way of<br />

pilotage or berthing services, the provision of navigational facilities, including buoys or<br />

other channel markings or otherwise, even if such loss, damage or delay shall have<br />

been caused by the negligence or other default of either Company, its servants,<br />

agents or contractors.<br />

If in connection with any use by any vessel of any berth or jetty or of any part of the<br />

Company’s premises, or of any gear or equipment provided by the Company, or of<br />

any craft or of any other facility or property of any sort whatsoever, belonging to or<br />

0000-S-90-01-P-0207-00-E<br />

Page 84 of 101<br />

BM Code: EP.14.03.01.09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!