21.01.2015 Views

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />

1 Introduction<br />

1.1 Purpose<br />

The purpose of this document is to provide guidance for vessels whilst operating in the area of<br />

<strong>Prigorodnoye</strong> export terminal.<br />

1.2 Scope<br />

The scope of these procedures are applicable to all SEIC employees, it’s contractors, and<br />

service providers and to all tankers visiting the <strong>Prigorodnoye</strong> LNG or Tanker Loading Unit (TLU)<br />

export terminal .<br />

1.3 Terminology<br />

TERM<br />

MEANING<br />

Shall<br />

Should<br />

May<br />

Indicates a mandatory course of action.<br />

Indicates a preferred course of action.<br />

Indicates a permitted course of action.<br />

1.4 User Notes<br />

The requirements of this document are either mandatory, preferred or permitted, as specified.<br />

Non-compliance shall be authorised using the deviation procedure described in Chapter 10 of<br />

the Corporate Document Control Procedure (0000-S-90-01-P-0078-00-E).<br />

A controlled copy of the current version of this document to available to permitted SEIC sources,<br />

located in LiveLink and is available via the Sakhalin Energy website. Before using this document<br />

it is the users responsibility to ensure that any hard or electronic copy is current. The Document<br />

Custodian should be contacted for assistance and any feedback.<br />

2 Risks and Controls<br />

2.1. Risks<br />

The risks associated with these regulations are those of marine collision, fire, environmental<br />

pollution and disruption to export facilities for both crude oil and LNG from <strong>Prigorodnoye</strong> export<br />

terminal.<br />

2.2. Controls<br />

2.2.1 Performance Monitoring<br />

Compliance with this procedure shall be monitored through periodic and random site<br />

inspections, vessel inspections and audits.<br />

0000-S-90-01-P-0207-00-E<br />

Page 9 of 101<br />

BM Code: EP.14.03.01.09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!